Download presentation
Presentation is loading. Please wait.
Published byIzabella Brought Modified over 9 years ago
1
Welcome OSU IEM to Cameron OKC Surface Systems
2
OKC SURFACE SYSTEMS 2
3
Safety Minute: Safety is a full time job … Don’t make it a part time practice! HSSE 3
4
If you see a Fire or Hear Evacuation Alarm: Report all fires to the nearest supervisor’s office Evacuate the building Proceed to the Assembly Area at the North East Corner of the Facility Find your Cameron representative for them to get a head count 4
5
Don’t Touch Falling Objects Fork Lifts & CranesNO Smoking Watch Your Step NO Cell Phones Plant Safety Awareness 5
6
About Cameron Our Divisions Markets Served Cameron’s Global Network Purpose and Core Values Cameron Overview 6
7
About Cameron 7 Fortune 500 company with strong balance sheet $8 billion revenues in 2012 Leadership position in most every market segment served Leading aftermarket service provider 27,000+ employees in 300+ locations worldwide
8
Our Divisions 8 Cameron is a leading provider of flow equipment products, systems and services to worldwide oil, gas and process industries… Cameron Valves & Measurement Distributed Valves Engineered & Process Valves Measurement System Valve Automation Drilling & Production Systems Drilling System Surface Systems Process & Compression Systems Compression Systems Process Systems OneSubsea Integrated Solution Control Systems Processing Systems Production Systems Subsea Services
9
Markets Served 9 What business are we in? Cameron is in nine market segments, offering a full suite of products and services to the drilling, production, processing, refining, petrochemical & LNG, transmission & storage and industrial segments of the industry. Upstream to Downstream, Onshore to Offshore, Cameron is There.
10
Cameron’s Global Network Manufacturing, Sales, Engineering and Aftermarket Our worldwide presence of 300+ locations includes 40+ manufacturing plants.
11
Purpose and Core Values Core Purpose Core Values
12
History Capabilities Products Facility Overview 12
13
Plant History 1969Creation of Gulfco 1979Moved into current facility 1984Acquired by Ingram 1986 Merged with Cactus 1996Acquired by Cameron 13
14
Oklahoma City, Oklahoma, USA Primary Facility Type: Manufacturing Engineering Service Heat Treating Manufacturing Assembly NDE Testing Welding Plant Size (20 acres) Site 130,000 sq. ft. –Warehouse25,000 sq. ft. –Machine/Weld Shop60,000 sq. ft. –General Workshop 30,000 sq. ft. –Office Area 15,000 sq. ft. Customer Property Storage Outside Space 3 acres Immersion UT Weld Cladding Hydro Testing Gas Testing Inspection Blast/Paint 14 Office
15
Wellhead Terminology 15
16
Gate Valve Summary Working Pressures up to 20k psi. Nominal size 1 13/16” to 9 1/16”. API Material Class AA to HH. PSL 1,2 &3 Full clad, HIP Clad Customer specific requirements Wellhead Summary Working Pressures up to 20k psi. API Material Class AA to HH. API Temp Class range K to X (-75F to 350F). PSL 1, 2 & 3 Full Clad, HIP Clad Customer specific requirements Conventional and Compact Wellheads Oklahoma City Center of Excellence: For the manufacture and supply of conventional and compact wellheads, as well as gate valves of various designs. FLFLS 16
17
Facility includes Weld cladding Horizontal & vertical boring machines Assemble & gas testing Immersion Ultrasonic Testing Oklahoma City Center of Excellence: For the manufacture of Hi-Spec block trees, bonnets, tubing hangers and slip type hangers. FH Style FHY Style FFY Style Tubing Hangers Single Unit Blocks Slip type Hangers 17
18
SURFACE SYSTEMS Current Situation OKC Surface Plant manufactures products to support NSAM field locations and customers 18
19
Required PPE Safety glasses Closed toe shoes (stay within the yellow lines) Hearing protection Plant Tour 19
20
Small Vlv A&T cell Large Vlv A&T cell WH A&T Gas Test Stack-up (FAT) Hgr Assy Gen Mill Hgr cell Mill / Turn Gen Lathe S WH cell S Vlv cell Gen Mill/ Lathe M WH cell WH cell Gen Mill M WH cell Turn cell M Vlv cell Large Vlv Cell HBM Large VTC Weld shop Paint Booth QC Receiving QC NDE QC WIP Manual Lathes X&T Mill Large Mill Warehouse Plant Layout N Conference Room 20
21
21 Expect the unexpected. Gear up for safety. Please remember in order to be safe… not only for you, but for your co-worker and your family.
22
Contact Information 22 Ryan Charles GRDP, 2 nd Shift Assembly Supervisor Ryan.Charles@c-a-m.com William Baker Sr. Planner William.Baker@c-a-m.com Visit the Careers page at www.c-a-m.comwww.c-a-m.com Visit our Facebook page at www.facebook.com/CameronCareers www.facebook.com/CameronCareers
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.