THE COLLEGE AT BROCKPORT Facilities and Planning Capital Update College Senate November 26, 2007
2
THE COLLEGE AT BROCKPORT Funding Programs SUCF Capital (State University Construction Fund) MR&R (Minor Rehabilitation & Repair, “Lump Sum” SUCF) DIFR Capital (Dorm Authority—DASNY Bonds) DIFR (Res. Life--Annual Small Projects) Campus State $ (Alterations, Parking, EH&S, Priority Needs, Department) Other (NYPA, Institutional Advancement, BASC, Grant, Unique) FACILITIES and PLANNING
3
THE COLLEGE AT BROCKPORT SUCF Capital Initial Capital Program ($35M) 1998 - 2003 Remaining Projects Lennon South - HVAC, Utilities, Greenhouse & Smith “Swing Labs” $1.5M (under construction by NYPA until spring ’08) REOC Purchase & Renovate One City Center - $29M FACILITIES and PLANNING
4
THE COLLEGE AT BROCKPORT SUCF Capital “New” Capital Program ($49.9M) 2004 - 2009 Execute with NYPA MetroCenter HVAC & Code – $3.1M, under construction Rakov HVAC & Windows – $1.6M, complete Morgan Roof – $400K, complete A.W. Brown Rooftop HVAC Units – $1.1M, Dec. ’ 07 FACILITIES and PLANNING
5
THE COLLEGE AT BROCKPORT SUCF Capital (cont’d) Execute with SUCF Roofs Under Construction – Drake, Tuttle North & South - $6.4M Hartwell Roof - $4.4M Under Design – TFA Renovation - $12.4M, Smith Renovation - $19.6M, Cooper Roof - $3M Challenge: domino moves, relocations, swing space See Handout: Capital Plan 2004-2009 FACILITIES and PLANNING
6
THE COLLEGE AT BROCKPORT SUCF MR&R SUCF MR&R Annual Lump Sum $330K (Future $500K) Recently Completed Sanitary Sewer Upgrades - $60K TFA Vestibule - $60K Campus Mechanical/Electrical Repairs - $300K Repairs – Stairs/Ramps/Railings - $25K Vehicle Garage Lift - $35K Future (Examples) HVAC Coils & Dampers Asbestos Removal Minor Roof Repairs Edwards High Voltage Feed Replacement Project Manager FACILITIES and PLANNING
7
THE COLLEGE AT BROCKPORT Bonded DIFR Capital Townhomes - $18M 208 beds – “Self Funded” LEED Certifiable Under Design High Rise & Middle Quad Integrated Fire/Smoke System - $3.1M, 2008-09 Thompson Full Rehab - $7.5M, 2009 Next: MacVicar Rehab (2010-11) See Handout – Residence Halls FACILITIES and PLANNING
8
THE COLLEGE AT BROCKPORT Local DIFR (Annual Minor) Maintenance & Repair (DIFR Committee) $300K Annually for Small Projects Recently Completed (Examples) McLean Lounge Windows - $15K Mortimer Workout Room Windows - $40K 2007 - 2008 Plan (Examples) Morgan Roof High Rise Window Study High Rise Plaza Repairs/ADA FACILITIES and PLANNING
9
THE COLLEGE AT BROCKPORT Campus - State Funds Alterations (FP Committee) - $180K Annual Parking Lot D1 Expansion - $350K Parking Lot W1 (complete) and W (summer 08) EHS Diesel Generator Upgrades - $150K TFA Wax & Welding Exhaust Priority Needs and Special Programs Edwards Blue Room Carpet Walkway, Ramps & Steps ADA Improvements Blue Light Phones FACILITIES and PLANNING
10
THE COLLEGE AT BROCKPORT Other Sources NYPA – Performance Contracts NYPA Phase 3A & B $12.9M for 30 Items – $8.5M SUCF w/Balance Cost Avoidance Financed BASC Harrison Renovation $3.5M BASC Funds with NYPA Execution - $475K SUCF Institutional Advancement Football Field Turf Design - $70K Grants Lake Ontario Natural Resource Center - Congress - $300K of $12M (Rep. Reynolds) NYSERDA & POCR - $550K for Energy Conservation Unique/Strategic Initiatives Special Event Rec. Center – Legislative Item - $39M REOC Downtown Relocation - $29M (Legislative Item) New Academic Building - $30M (TBD) FACILITIES and PLANNING
11
THE COLLEGE AT BROCKPORT Planning—What is Next? 2001 Capital Study - Still Guiding Us FP Committee – On Going Updates/Priorities 2007 Condition Assessment Re-Look & Update Enrollment Management Task Force Matrix (goals & initiatives) MOU with SUNY Sustainability/Energy Programmatic Needs Master Plan Coming FACILITIES and PLANNING