Download presentation
Presentation is loading. Please wait.
Published byErin Round Modified over 9 years ago
1
DESIGN OF HVAC SYSTEMS in the KNIGHT MANAGEMENT CENTER FACULTY OFFICE BUILDING STANFORD UNIVERSITY Min Jae Suh Kawika Nakoa Karthik Jayachandran
2
Hierarchy of Teams STAKEHOLDERS DECISION MAKERS
3
Hierarchy of Team (Designers) Plumbing consultant/ designer
4
Hierarchy of Team (Stakeholders) GSB FACULTYGSB STAFF PHD students Sloan Students MBA Students Non-GSB Students Professors (Stanford) Visiting Professors (Other University) Visiting Scholars (Company) GSB STUDNETS Library Workers Cafeteria Workers Officers of Departments
5
Hierarchy of Team (Decision Makers) Facility Operations and Maintenance
7
Hierarchy of Goals OPERATIONSCOST
8
Hierarchy of Goal (Satisfy Building User) symbol of innovation
9
Hierarchy of Goal (Cost) Spend money wisely Constructability of design Energy Use Air Quality Water Consumption Material Use & Consumption Waste Production
10
Hierarchy of Goal (Operation) controlled access Accessible Low Operational Costs (easy to clean, fix and understand)
12
CURRENT STATE MODEL
13
FUTURE STATE MODEL
14
Questions ???
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.