1 Columbia School District 2013 Bond Program

2 I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES P ROJECT C ONTACTS

3 P ROJECT S COPE R EVIEW C OLUMBIA C ENTRAL H IGH S CHOOL (BP 02) -R ENOVATE NEW 7 TH /8 TH GRADE WING -N EW ADDITION - L OCKER R OOMS -A DMINISTRATION R ENOVATION / S ECURE E NTRANCE -U PGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT H.S. -N EW A RCHITECTURAL AND S CIENCE LAB CASEWORK -U PGRADE B UILDING HVAC AND C ONTROLS -U PGRADE B UILDING L IGHTING, F IRE A LARM, E LECTRICAL -U PGRADE T ECHNOLOGY -S ITEWORK – ATHLETICS, PARKING, BUS AND PARENT DROP OFF AREAS

4

5

6 P ROJECT S COPE R EVIEW E LEMENTARY, I NTERMEDIATE, AND O PTIONS S CHOOL (BP 03) -R ENOVATIONS TO ACCOMMODATE GRADE LEVEL RECONFIGURATION -A DMINISTRATION R ENOVATION / S ECURE E NTRANCE -U PGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT -R ENOVATE TOILET ROOMS -N EW CASEWORK -U PGRADE B UILDING HVAC AND C ONTROLS -U PGRADE B UILDING L IGHTING, F IRE A LARM, E LECTRICAL -U PGRADE T ECHNOLOGY

7 T IMELINE B ID P ACK 02 – ( HIGH SCHOOL ) – B ID D OCUMENTS A VAILABLE W EEK OF O CTOBER 20, 2014 – B IDS D UE W EEK OF N OVEMBER 17, 2014 – B ID R EVIEW / P OST B ID I NTERVIEWS TO SUPPORT 12/1/14 AWARDS C ONSTRUCTION – 7 TH /8 TH G RADE W ING 12/1/14 – 4/6/15 (S PRING B REAK ) – L OCKER R OOM A DDITION S TART 3/30/15 – R EMAINING B UILDING S TART A FTER S CHOOL – A LL WORK S UBSTANTIALLY C OMPLETE F IRST W EEK S EPTEMBER 2015 FOR S CHOOL B ID P ACK 03 (E LEMENTARY AND M IDDLE S CHOOL ) – S TART IN SOME AREAS AT SPRING BREAK ( APRIL 2015) – B ALANCE OF WORK IN SUMMER 2015

8 T IMELINE

9 A NTICIPATED W ORK C ATEGORIES D EMOLITION S TRUCTURAL C ONCRETE M ASONRY S TRUCTURAL / M ISCELLANEOUS S TEEL G ENERAL T RADES R OOFING A LUMINUM / G LASS & G LAZING D RYWALL / A COUSTICAL / P LASTER R ESILIENT F LOORING AND C ARPET H ARD T ILE P AINTING AND C OATINGS L OCKERS I NTERIOR & E XTERIOR S IGNAGE / B ANNERS P LUMBING HVAC E LECTRICAL / F IRE A LARM E ARTHWORK AND U TILITIES A SPHALT P AVING / S TRIPING A THLETIC S URFACES / E QUIPMENT S ITE C ONCRETE F ENCING L ANDSCAPE / T URF & G RASS / P LANTINGS

10 Q UESTIONS & A NSWERS Question: Will there be a local preference for the bids? Answer: No, however the owner has the right to accept or reject any or all offers. Question: Will plans and specifications be available at ABC Reproduction? Answer: Yes. Bid Docs can be reviewed on Granger FTP site. Question: Will the mechanical package be one package (Plumbing/HVAC) or separate packages? Answer: Separate packages Will this be a prevailing rate job? Answer: Yes Will certified payroll be required? Answer: Yes Will a bid bond be required in the amount of 5% be required? Answer: Yes Will a performance bond be required? Answer: Yes

11 C ONTACT I NFORMATION G RANGER C ONSTRUCTION C O. M ATT L ERG MLERG @ GRANGERCONSTRUCTION. COM D ENISE S TYX DSTYX @ GRANGERCONSTRUCTION. COM W EBSITE HTTP :// RESTORETHESOARWITHGRANGER. COM /