Download presentation
Presentation is loading. Please wait.
Published byKareem Towner Modified over 9 years ago
1
SUCCESS WITH GEOTHERMAL HEAT PUMP SYSTEMS IGSHPA 2008 - NASHVILLE Image Engineering Group, Ltd Don Penn, PE, CGD www.iegltd.com © IEG, LTD 2008
2
PREFERRED WELL FIELD DESIGN Vertical Wells Advantages Requires least amount of Land Least amount of total piping Least amount of Pumping Energy - less than 25 feet of head. More Consistent Ground Temperature versus Horizontal Well Fields Well Field square footage similar to square footage of space being conditioned. Vertical Wells Advantages Requires least amount of Land Least amount of total piping Least amount of Pumping Energy - less than 25 feet of head. More Consistent Ground Temperature versus Horizontal Well Fields Well Field square footage similar to square footage of space being conditioned.
3
ROACH MIDDLE SCHOOL WELL FIELD LOCATIONS
5
TYPICAL INSTALLATION OF GEOTHERMAL SYSTEMS Use HDPE for Piping thru out NFPA Classification of “Non-Flammable or Combustible”. Metal in Systems is limited to Pump Housings, Valve Bodies and Water to Refrigerant Heat Exchanger in GHP. Use V-Track hanger to provide neat orderly installation and eliminate pipe sagging. Individual Pump(s) per GHP System Operates between 30 and 45 psi. Use HDPE for Piping thru out NFPA Classification of “Non-Flammable or Combustible”. Metal in Systems is limited to Pump Housings, Valve Bodies and Water to Refrigerant Heat Exchanger in GHP. Use V-Track hanger to provide neat orderly installation and eliminate pipe sagging. Individual Pump(s) per GHP System Operates between 30 and 45 psi.
6
FRISCO ISD SCHOOLS MECHANICAL COST COMPARISON CAMPUSYEAR BID SQ FTMECH COST* $ / S.F. Bright Elem200171860$968,922.00$13.48 Spears Elem200271555$970,621.00$13.56 Riddle Elem- Geo200372848$981,284.00$13.47 Pink Elem-Geo200476000$1,054,261.00$13.87 Pioneer Middle2001137245$1,676,435.00$12.21 Wester Middle2001137245$1,676,435.00$12.21 Griffin Middle - Geo2002138651$1,679,000.00$12.11 Roach Middle - Geo2004138650$1,709,000.00$12.33 - Includes Controls and Condensate Drains / Costs are not adjusted for inflation or escalation - 2006 Costs are $15 to $16 per square foot
7
BIRDVILLE ISD SCHOOLS COMPARISON - YEAR 2000-2001
8
FRISCO ISD ELEMENTARY SCHOOLS COMPARISON - YEAR 2005-2006
9
FRISCO ISD MIDDLE SCHOOLS COMPARISON - YEAR 2005-2006
10
FRISCO ISD HIGH SCHOOLS COMPARISON - YEAR 2006
11
Richland Middle School Areas previously without HVAC
12
RICHLAND MIDDLE SCHOOL - BISD Geothermal System Installed in 1995
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.