Sarah Chan, Aima Ojehomon, Akshay Adya, Eno Inyang KOWLOON BAY
2
Introduction
4
Team
5
Scope
6
Objectives Define Objectives… …Determine Priorities MACDADI Tool
7
Preferences Define Objectivs… …Determine Priorities MACDADI Tool
8
Alternatives Exit
9
Objectives Information Access Efficiency Layout Passenger Mobility Aesthetically Pleasing Clean Passenger Perception Vision 2020 Energy Cost Optimization HVAC Comfort Visual Comfort Passenger Comfort Congestion Analysis Egress HVAC Comfort Daylighting Energy Use Analysis
10
Passenger Mobility Congestion Baseline model peak 6pm weekday Show model, cite conges 28 minutes into rush hour Entrance B platform escalator Entrance A platform escalator
11
Passenger Mobility Congestion Baseline model peak 6pm weekday Show model, cite conges 28 minutes into rush hour Entrance B platform escalator Entrance A platform escalator
12
Passenger Mobility Congestion Baseline model peak 6pm weekday Show model, cite conges Entrance B platform escalator at 28 min
13
Passenger Mobility Congestion Baseline model peak 6pm weekday Show model, cite conges Entrance A platform escalator at 28 min
14
Passenger Mobility Congestion Traditional Method Use people per area as a determination of Congestion Problem Entity paths pre determined, therefore not valid measurement Solution Analogy Cars in traffic Similar constraints: single lane, multiple goals Defining Congestion Testing Method Traffic Congestion Analysis Time in system - Peak : Time in system - Target Traffic Congestion Analysis Time in system - Peak : Time in system - Target
15
Passenger Mobility Congestion Traffic Congestion Analysis Time in system - Peak : Time in system - Target Traffic Congestion Analysis Time in system - Peak : Time in system - Target System Peak Weekdays 6pm hour 16,360 people System Target Sundays 6pm hour 7,300 people
16
Passenger Mobility Congestion Traffic Congestion Analysis Time in system - Peak : Time in system - Target Traffic Congestion Analysis Time in system - Peak : Time in system - Target 2.7 min
17
Passenger Mobility Congestion Traffic Congestion Analysis Time in system - Peak : Time in system - Target Traffic Congestion Analysis Time in system - Peak : Time in system - Target Objectives Score Evaluation Metric -3 7.54 min -2 6.74 min 5.94 min 0 5.14 min 1 4.34 min 2 3.54 min 3 2.74 min
18
Passenger Mobility Congestion Alternative 1 – Simple
19
Passenger Mobility Congestion Alternative 2 – Intensive
20
Passenger Mobility Congestion Results 2.7 m
21
Passenger Mobility Congestion Alternative 1 TargetPeakAlt 1Alt 2 Hours0.0450.120.07.08 Minutes2.727.544.744.94 Alt 1Alt 2 % Reduction in time 58%54% Objective Rating 11
22
Passenger Mobility Egress - Data
23
Passenger Mobility Egress- Modelling 1390 people Randomly placed 50 % Male & 50% Female Low Stress, Co-operative Multi Agent System -3-2012+3 >10min7-10 min5-7 min4-5 min3-4min1-3min<1 min People Obstacles Exit Goal
24
Passenger Mobility Egress Baseline : 3 Exits Time : 5min 38 sec -1
25
Passenger Mobility Egress Baseline : 3 Exits Time : 5min 38 sec -1
26
Passenger Mobility Egress Alternative 1 : 4 Exits Time : 2 min 59 sec 1
27
Passenger Mobility Egress Alternative 1 : 4 Exits Time : 2 min 59 sec 1
28
Passenger Mobility Egress Alternative 2 : 5 Exits Time : 3 min 20 sec 0
29
Passenger Mobility Egress Alternative 2 : 5 Exits Time : 3 min 20 sec 0
30
Baseline (Tool : Hevacomp) General Parameters : 5-12 pm daily Kings Park, HK Glazed windows (Optifloat 6 mm argon) Design Temperature: Modeled as 26 °C Must be < 28 °C (summer) Max Temp outside air = 34 °C Only the Concourse Level is considered in the analysis. Energy Usage Cost Optimization
31
Process Energy Usage
32
Energy Analysis Energy Usage Cost Optimization Escalator Energy pertaining to the Concourse = ½ of total (split between concourse and platform )
33
Baseline Several open door entrances : Two 4 x 3.4 m and one 10.5 x 3 m and one 5 x 3 m 12 escalators Energy Usage Cost Optimization Baseline
34
Alternative 1 Add 1 entrance, 10.5 x 3 m Remove 2 windows Add 2 escalators (14 total) Energy Usage Cost Optimization Alternative 1
35
Alternative 2 Add 2 entrances, 10.5 x 3 m each Remove rooms near each entrance Add 1 escalator (13 total) 1 Energy Usage 0 Cost Optimization Alternative 2
36
Comparison Energy Usage Alternative 1 to the have the highest energy use, with 2 additional escalators Alternative 2 has the lowest energy use, even with 1 additional escalator 0 Cost Optimization Comaprison
37
Passenger Comfort Modelling
38
HVAC (TAS) Inputs | Internal Conditions
39
HVAC (TAS) Inputs | Apertures Alternative 1: ‘Wall Openings – Doors’ + ‘Window Openings (alt 1)’ Alternative 2: ‘Wall Openings – Doors’ + ‘Window Openings (alt 2)’ Baseline: ‘Wall Openings – Doors’
40
HVAC (TAS) Analyses Alternative 1 (& Baseline) Alternative 2
41
Passenger Comfort HVAC Inferences Creating these new openings has little to no effect on HVAC. Internal temp (35⁰C) at peak external temp (36⁰C), 7⁰C over target temp (28⁰C).
42
HVAC Evaluation | Metrics
43
Daylighting Inputs | Revit
44
Daylighting Analyses | Shadow
45
Daylighting Analyses | Shadow
46
Daylighting Analyses | Illuminance
47
Daylighting Analyses | Illuminance (Baseline & Alt 1)
48
Daylighting Analyses | Illuminance (Alt 2)
49
Daylighting Inferences | General Alternative 2, with 2 more openings has a positive effect on daylighting
50
Daylighting Evaluation
51
Impacts
52
Values
53
Thank You By the way….. We made some news !news