Download presentation
Presentation is loading. Please wait.
Published byJaylen Enslow Modified over 9 years ago
1
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009
2
Congregation Survey Results
3
Participation: 202 completed responses 13% participation
4
General Facility Issues
5
Which Facilities are Needed Now (1 st Choice)?
6
Which are Needed Now (Top 3 Choices)?
7
Which are Needed in 2016 (1 st Choice)?
8
Which are Needed in 2016 (Top 3 Choices)?
9
Site & Property
10
What is Adequate?
11
Best “Asset” Among Facilities? Family Life Center (52) Sanctuary (46) Trees & Landscape (18) Katy Location & History (18)
12
Most Glaring “Deficiency?” Conditions & Appearance (60) Sanctuary & Gathering Space (28) Education Space Qty (23) Parking (18)
13
Any Elements that are “Sacred” and MUST NOT be Disturbed?
14
If “Yes,” Which Elements Are Sacred? Fellowship Hall (51) Trees (23) Sanctuary (16)
15
OK to Demolish Structures?
16
If “Yes,” Which Elements Are OK to Demo? Education Building (75) Anything Necessary (20) Fellowship Hall* (16) Sanctuary (13)
17
Buildings
18
What is Adequate?
19
Objections to Multi-Story?
20
Architectural Character
21
Which Symbol Should Identify Facilities?
22
Exterior Architectural Character? 20% 2% 52% 26%
23
Exterior Material?
24
Maintain Existing Theme or Go with Something New?
25
Worship Space
26
Worship Service Attended
27
How Full is Worship Service Attended?
28
Sanctuary – How Big in 2016 ?
29
How Long OK to Worship in Multi-Purpose?
30
Worship Space Configuration? 48% 38%14%
31
Choir Location? 4% 86% 10%
32
Communion Rail?
33
Prominence of Liturgical Elements
34
Fellowship Spaces
35
Desired Uses of Fellowship Spaces? Highest are “Core” Church Usages Lowest are Sports
36
Food Service Type?
37
Planning Issues
38
Planning Priorities: IMMEDIATE Need Sunday School Needs in Aggregate are Large
39
Planning Priorities: Summary
40
Respondent Information
41
RESPONDENTS: Age
42
RESPONDENTS: At-Home Adults
43
RESPONDENTS: At-Home Children
44
RESPONDENTS: How Long a Member?
45
Reasonable & Achievable Budget?
46
General Issues
47
What are the most important issues NOW? Funds Need to Grow Parking Condition of Buildings
48
What are the most important issues in 2016? Accommodating growth Space limitations Youth programs Funds
49
Overall Conclusions
50
LONG TERM master plan Include all components except: Athletic fields Coffee shop Optimism for future
51
NEAR TERM priorities Parking & drop-off Education space (esp. LPS) Gathering /Welcoming space Nursery
52
NEAR TERM priorities (cont.) Worship space improvements FLC improvements Missions & scouts (will need Administrative)
53
KEY “Others” FLC and Sanctuary are assets Condition & appearance detract Sentiment for Fellowship Hall OK to demo Education bldg
54
KEY “Others” Tradition: Fellowship Hall Worship shape & choir Katy location & trees
55
Worship Space LONG TERM: 1.5-plus x current size Fan-shape seating (slight favorite) Communion rail Choir in traditional location
56
Program Statement Facilities Needs Vision
57
Christian Education - Gr 3 to Adult HAVE 16 classrooms of varying sizes & condition Four of these (in FLC) are actually 8 used as 4 Library in FLC Scattered storage ~12,300 GSF WANT NOW To be determined (must resolve shared space strategy) WANT IN FUTURE 25 classrooms total 10 classrooms of standard size for Gr 3 thru Youth Adult classrooms of varying size Workroom Library ~19,200 GSF (total = 56%)
58
Christian Education - Little People’s School HAVE 10 classrooms of varying sizes & condition Scattered storage ~5,900 GSF WANT NOW To be determined (must resolve shared space strategy) WANT IN FUTURE 18 classrooms total Kids gym Movement & music space Administrative area and Workroom ~13,400 GSF (total = 127%)
59
Christian Education - PK3 thru Gr 2 can use Little People’s School
60
Worship Space HAVE 450 seat Sanctuary (including ancillary spaces) Choir practice room ~7,700 GSF WANT NOW Connected Welcome Center / Narthex (see Ministries) Improvements to Sanctuary @ chancel, choir, balcony WANT IN FUTURE Larger seating capacity in Sanctuary (900?) Up-to-date ancillary facilities ~14,400 GSF (total = 87%) Issue to resolve: traditional & contemporary services in same space?
61
Ministries Spaces HAVE Existing Narthex ~600 GSF WANT NOW Commodious Welcome Center Narthex enlarged for existing Sanctuary (with Welcome Center) Porte cochere (covered drop-off @ Welcome Center) Nursery (larger & better) ~4,700 GSF ( = x8) Scouts hall for 30 persons (~850 GSF) Garages for Missions and Scouts Canopies for trailer & van WANT IN FUTURE “WANT NOW” will satisfy all envisioned needs
62
Fellowship Spaces HAVE Family Life Center 350 persons max at tables, 480 auditorium style Stage Commercial kitchen Acoustical issues to be remediated Fellowship Hall 100 persons max at tables, 140 auditorium style Stage Kitchen Functional issues due to age of structure HCP accessibility issues ~14,800 GSF
63
Fellowship Spaces (continued) WANT NOW Present facilities are adequate Must address FLC acoustical issues WANT IN FUTURE Space to seat up to 500 at tables Commercial kitchen Space that seats up to ~300 at tables (current FLC) Kitchen (large warming kitchen, at minimum) Two meeting rooms that seat up to ~120 at tables Coffee bar service Storage for tables & chairs ~25,600 GSF (total = 73%)
64
Youth Space HAVE FLC three rooms on south side Access to FLC gym space ~1,400 GSF WANT NOW Maintain existing space WANT IN FUTURE Maintain existing space
65
Administrative Spaces HAVE Offices for 9 FTE’s Ancillary spaces ~3,200 GSF WANT NOW Offices for 10 FTE’s + volunteer “hotel” space Ancillary spaces More counseling & conference rooms Larger & more functional reception area ~4,800 GSF ( = 50%) WANT IN FUTURE Same as “WANT NOW” plus…. 4 more offices for FTE’s Maintenance office ~700 GSF plus “WANT NOW” (total = 72%)
66
Other Elements PARKING Each city block ~1.4 acres Presently have 88 “on-site” spaces 42 in “east” lot (includes van & trailer spaces) 22 in “north” lot 22 in angled curbside spaces would lose capacity if striping done per codes & standards Should have 150 minimum for current seating 180 optimal per current standards (1.3 acres) For 900 seats (future), need 300 minimum 360 optimal (2.5 acres)
67
Other Elements STORAGE Increase by 10% ~5,700 GSF
68
SUMMARY LONG TERM: +39ksf NEAR TERM: +10ksf to 17ksf Focus: Parking Education spaces Welcome Center Remedial: FLC & Sanctuary, HVAC
69
Next Steps
70
SCHEDULE FOR COMPLETION Sep 8: Oct 6: Nov 3: Nov 10: Program Statement Approved Master Plan Options Developed & Selected Next Phase Concept & Budget Deliverables
71
Thank You ! PROJECTS WITH SIGNIFICANCE
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.