1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions During assembly, keep room relative humidity above 25% Monitor ESD events 3.The camera head may be used in UHV environments LBNL 1 CYCLOTRON RD BERKELEY, CA 94720 ASSEMBLYDRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DRAWN: N.ANDRESEN J. JOSEPH CHECK: DATE:
2
2 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: 1. Inspect Cu Block pads for flatness using a spare SiC Substrate 2.Attach to 2.75” CF Flange 3.UHV CLEAN 1 STEP 1:STEP 2: 1.Install Clock & Bias board by gently wrapping Flex Assy around Cu block – note lower mounting tabs for proper orientation. 2.Attach to the Cu block using 2 #6 Button head screws as shown. Do not tighten screw – C&B board should float in place. 2 AND OPPOSITE MNT HOLE Bare 1K-FS Cu Cooling BlockClock & Bias Board Installation UHV CLEANESD SENSITIVE
3
3 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: STEP 3: Sensor/Top Board Installation 1.SENSOR mounted on the TOP Board can be damaged by ESD – Proper handling is extremely important from this point and in all following assembly steps.. 2.NOTE: Wire bonds are exposed on the component side of the TOP board assembly. 3.Install TOP board – set assembly, component side down and couple connectors to the C&B board connectors 4.Place a Diamond Insulator on each of the 4 Cu block fingers, and align it with the TOP board assembly with an appropriate pin (can be a screw, do not tighten) 5.Insert a 2-56 x 1” screw with a wide washer and nut attached, in each of the mounting holes of the TOP board to C&B board connectors (4x) and twist them in until the screw bottoms out into the C&B board connector, Be sure that the nut and washer are loose on the SiC side of the TOP board assembly. The screws will put the connectors into alignment. 6.Gently tighten all 4 of the nuts against the TOP board assembly. Using an open end wrench, slowly tighten all 4 nuts, rotating from nut to nut after ~ ½ turn per point, until the connectors are fully seated. 7.Remove all of the insertion screws, and return to the assembly tool kit 4 4x Diamond Insulator 5 4x NOTE: The connectors will come together very easily with the insertion tool – DO NOT FORCE. If there is resistance to the insertion, stop the process, separate the connectors and inspect for issues Measure the following: 1.R between the SiC and Cu Block 2.R between V SUB and VDDOUT 3.R between V SUB and GND 4.N EDGE to GND (J3 & J4, pins 84 & 85) 5.N EDGE to V DDOUT (J3 & J4, pins 84 & 83) 6.J3 & J4 Shell to Cu block 7.SiC to V DDOUT UHV CLEANESD SENSITIVE
4
4 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: STEP 4: fCRIC Digitizer Board Installation 1.NOTE: Wire bonds are exposed on the component side of the fCRIC Digitizer board assembly. 2.Install fCRIC Digitizer board – set assembly, component side facing the Cu block, and couple connectors to the TOP board connectors 3.Set the fCRIC insertion tool on TOP board, aligned with the connector holes, and insert the attachment screws through the TOP board and tighten into the fCRIC connector jackscrew holes 4.Starting by hand, tighten the larger, socket head screws, applying pull evenly, until the connectors start to mate (they will be aligned by the previous step) 5.Finish seating the connector contact using a hex wrench. The connector will come together very easily with the insertion tool – DO NOT FORCE. If there is resistance to the insertion, stop the process, separate the connectors and inspect for issues 6.Remove all of the insertion screws, and repeat for fCRIC Digitizer board on opposite side of the assembly. If both boards have been installed, return the tooling fixture to the assembly tool kit 3 UHV CLEANESD SENSITIVE
5
5 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: Install TOP board screws (do not tighten), insulators, springs and spacers as shown. Successively snug each screw until all are lightly tightened. Then back-off each screw by one-quarter turn. Measurement the continuity between the SiC Top-Board and Copper cooling block which should be an open-circuit. The resistance from the SiC to the Heater bars should be open. STEP 5: Secure TOP board to Cu block Silicon-Carbide Top-Board 2x Belleville spring washers Copper cooling block Top-board Bus clamp Top-board Bus clamp screw Polyimide washers PTFE shrink tubing CVD Diamond spacer 0.5-mm Top-Board heater Copper bus UHV CLEANESD SENSITIVE
6
6 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: STEP 6:STEP 7: Install fCRIC and C&B board FastenersInstall RTD sensors and Frame-Store shield 1.Install fasteners that are used to secure the fCRIC Digitizer and C&B boards to the Cu block. 2.Install spacers, washers, and button head screws to all 8 mounting locations before securely tightening the boards to the Cu block 3.Tighten securely after all fasteners are in place, NOTE: A spacer block is required between boards for the fCRIC Digitizer that mounts in parallel to the back face of the C&B board.. UHV CLEAN Frame Store Shield 1.Set Frame Store Shield Assembly into the imaging widow area on the top of the Camera Head assembly. 2.Lightly secure using 2-56 x ½ inch button head screws 3.Attach Kapton PT100 RTD (Minco #...) to the TOP board as noted. Bend the leads over the edge of the camera head and secure with a small piece of ½ inch wide Kapton tape. 4.Secure Heater wires in the same way. RTD Location ESD SENSITIVE Spacer 2x
7
7 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE:
8
8 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: Mount housing base Mount housing sleeve Mount housing cap and filter slide Insert filter Insert filter cover STEP N: Application Specific, Light Housing Installation
9
9 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: STEP N+1: Immersion Probe Installation Information Immersion chiller probe Copper cooling block Lubricate probe and camera bore with a very thin film (~0.0005”) of Apiezon “N” cryogenic vacuum grease. O-Ring, 2-027, Silicone Immersion probe, Polyurethane retaining spring. Install onto camera after installing Immersion chiller probe and before making CF flange connection. Fill this void to limit the build-up of ice. Immersion probe installation. Install a lubricated (Apiezon “N”) Immersion probe into the camera bore to a point where the o-ring engages the probe body. Attached a hand operated vacuum pump to this port and apply vacuum until the probe is seated. No additional load should be applied to the probe for installation. To remove probe apply a minor gas pressure to this port. To remove a probe which has become jammed in the camera; fill the volume of this tube and the space between the probe and the copper cooling block with water, attach a hydraulic pump and apply pressure (if hydraulic fluid is used in the pump, a double acting hydraulic cylinder can be inserted between the pump and the camera to isolate the two fluids).
10
10 ASSEMBLY DRAWING: 1kFSCCD STD CAMERA HEAD DWG NUMBER : Rev: A DATE: