Download presentation
Presentation is loading. Please wait.
Published byNelson Wickett Modified over 10 years ago
1
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us TANKLESS WATER HEATING TECHNOLOGY Commercial Laundry Applications
2
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Why tankless water heaters? Building a case for tankless: The key factors that are important: Energy Efficiency Unlimited Hot Water Cost – Capital & Operating Commercial vs. Residential ROI Sizing & Piping Redundancy Code Alert Modulation ULNOx Lifespan & Warranty
3
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Rinnai’s Global Presence Based in Nagoya, Japan Established in 1920 7000 employees worldwide Operates in over 43 countries RINNAI GLOBAL HEADQUARTERS Worldwide Leader 2010 turnover: $3+ Billion RINNAI’S GLOBAL PRESENCE
4
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Rinnai North America North American Headquarters: Peachtree City, GA Over 200 direct employees & representatives RINNAI AMERICA HEADQUARTERS Rinnai NA has its own CSA certified testing laboratory
5
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Rinnai America’s Heating Solutions Non-Condensing Tankless Water Heaters EnergySaver ® Direct Vent Furnaces Hydronic Furnaces Commercial Cooking products Condensing Hydronic Boilers Condensing Tankless Water Heaters Rinnai North America Products
6
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Basic Requirements Gas Delivery pressures range from: 5” wc – 10.5” wc for natural gas 8” wc – 13.5” wc for propane Water pressures requirements: 20 psig – 150 psig (50 psi recommended) Hot & Cold water supply lines to be minimum ¾” piping.
7
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us 1.Water flow begins 2.Ignition Sequence 3. Normal Operation 4. Shut-down Sequence 5.Standby Mode PCB / Surge Protector Water Flow Sensor Combustion Fan SV3 SV4 SV0 or SV Main Modulating Gas Valve/POV SV1 Water flow control valve Out going Temperature Thermistor Incoming Air Exhaust Bypass Sequence of Operation Igniter FR 2 FR 1 SV2 Condensate Trap Secondary Heat Exchanger Primary Heat Exchanger Heat Exchanger Thermistor Burner Sensor
8
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Types of Applications RESIDENTIAL APARTMENTS/CONDOS HOUSING AUTHORITES FOODSERVICE HOSPITALITY HEALTHCARE SCHOOLS GOVERNMENT / MILITARY CAR WASH LAUNDROMATS HAIR SALONS FITNESS CENTERS
9
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us THE BASICS Four important factors when sizing tankless units: Incoming ground water temperature Hot water demand Altitude Gas line size
10
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us ∆T Temperature Rise (°F) Water Flow (gpm) Understanding Maximum Flow Rate EXAMPLE (from previous page) Incoming water = 57° Rinnai Set-Point temperature = 120° Subtract the incoming ground water temperature from the water heater’s set temperature for ∆T 120° - 57° = 63 The maximum GPM flow rate for any given ∆T can be found at the intersecting points along each model’s specific flow curve A GPM flow test from the temperature controller can verify each unit’s performance RC98i/e Flow Curve Flow curves of each model are listed in each installation manual 63 If incoming water is 57° and requested temperature is 120°, ∆T is 63° and gpm flow rate is 6.0 gpm
11
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us RC Series Maximum Flow Curves RC98i/e RC80i/e ModelsRC98RC80 Max. Btu199,000157,000 T(°F) GPM 1402.72.1 1352.82.2 1302.92.3 1253.02.4 1203.22.5 1153.32.6 1103.42.7 1053.62.8 1003.83.0 954.03.1 904.23.3 854.43.5 804.73.7 755.04.0 705.44.3 655.84.6 606.35.0 556.95.4 507.66.0 458.46.6 409.57.5 ≤359.88.0
12
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us SIZING METHODS – Definitions Four methods used to sized tankless units: FLOW RATE (GPM) GPH REQUIREMENTS (GPH) WATER SUPPLY FIXTURE UNITS (WSFU) TANK WATER HEATER REPLACEMENTS (BTU)
13
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Application Project Form
14
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Sizing Report
15
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Sizing Report
16
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us PIPING DESIGN LAYOUT
17
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Rinnai Concentric Venting
18
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us 18 Vent Termination Requirements 36” (.91 m) to ventilated or unventilated soffit or eve vent; or to a deck or porch* 12” (.30 m) to an inside corner* 12” (30 cm) between Rinnai terminals at the same level 60” (1.52m) between Rinnai terminals at different levels 60” (1.52m) vertically between Rinnai terminals (Also applies to HPe models) 2 inches between outdoor units at the same level
19
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Why choose a Rinnai Tankless? Rinnai offers the most comprehensive warranty:
20
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Application Example
21
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Application Example 20 x20 lbs. 4 x30 lbs. 3 x60 lbs. 120F degree water
22
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Current Specification: 2 x Phoenix HTP PH199- 119 Gallons Tanks -Expensive -Large Space Needed -Standby Loss -Combustion Air -Only 3 years Warranty -Fail Tank = Leak and Replacement Application Example
23
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Sizing Report
24
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us COST/SAVINGS CALCULATION
25
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us COST/SAVINGS CALCULATION
26
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us Northern – 5 x Rinnai RC98 vs 2 x HTP Phoenix PH199-119 COST/SAVINGS CALCULATION Central – 4 x Rinnai RC98 vs 2 x HTP Phoenix PH199-119 Southern – 3 x Rinnai RC98 vs 2 x HTP Phoenix PH199-119
27
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us CONTACT INFORMATION WE CAN HELP PROVIDE YOU A RINNAI SOLUTION FOR ALL LAUNDRY APPLICATIONS! Rinnai will size your project and provide you a Commercial Sizing Report with Piping Diagram back to you within 48 hours and Free of charge. Please contact us at:. Rinnai Corporation 1-866-383-0707 engineering@rinnai.us 103 International Drive Peachtree City, GA 30269
28
www.rinnai.uswww.rinnai.us © 2011 Rinnai America Corporation engineering@rinnai.usengineering@rinnai.us PARTNERSHIP = SUCCESS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.