Download presentation
Presentation is loading. Please wait.
Published byBrenna Dingley Modified over 9 years ago
1
GEOPAK Bridge
2
Instructors Steve Atkinson Bill Politte Kevin Vollet (573) 751-5651 (573) 526-4447 (573) 526-5176
3
Instructors Steve Atkinson Bill Politte Kevin Vollet (573) 751-5651 (573) 526-4447 (573) 526-5176
4
Facilities Restrooms at either end of hallway Break room at “upper” end of hallway Coffee & refrigerator through the door to left Parking – Parking out front – Adjacent lots – MoDOT cars can use Garage
5
Schedule Begin at 8:00 a.m. Go until 3:30 p.m. +/- 1 hour lunch – 11:30 a.m. +/- Finish Wednesday mid-afternoon or around 3:30
6
Class Overview Intro to ProjectWise Setting up a new GEOPAK Job – Start Job (Chapter 1 & 2) Introduction to GEOPAK (Introduction) – Starting GEOPAK – Setting Up cadduser Preferences Accessing an Existing Project – Project Manager (Chapter 3)
7
Class Overview Coordinate Geometry (COGO) & Plan Design - Classic Coordinate Geometry Dialog (Chapter 4) - Graphical Coordinate Geometry Dialog (Chapter 5) Existing Conditions – Digital Terrain Modeling (Chapter 6) Plan Design – Existing Ground Profiles (Chapter 7) – Proposed Vertical Alignments (Chapter 8) – Superelevation (Chapter 9)
8
Directory Structure PW > MoDOT > Classroom – District XX > Bridge > – # - cadduser number on the base of monitor cadduser01 cadduser02 cadduser03 cadduser04 cadduser05 cadduser06 cadduser07 cadduser08 cadduser09 cadduser10 cadduser11 cadduser12 cadduser13 cadduser14 cadduser15
9
GEOPAK Road 1
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.