Download presentation
Presentation is loading. Please wait.
Published byAlonzo Primer Modified over 9 years ago
1
Centerville Elem. School Beverly, MA Front entrance
2
New wing
3
Back of new wing with clerestory and photovoltaics
4
Clerestory in new wing halls
5
Audicafeterium
6
Facing stage
7
Stage
9
Old wing
10
Hallway in old wing Old wing gutted to frame Cinder block walls in old/new Tile pattern matched in both wings
11
Gymnasium
12
Library w/ reading nook on left and computer room in rear
13
End of new wing – wind turbine on left
14
Retention pond captures rain runoff from roof
15
Hallway of old wing Library on left, entrance on right
16
Reading center
17
Classroom
18
Cubbies for kids – storage for teacher
19
Kindergarten
20
First grade
23
Centerville E-School - 2002 Add/reno of 1964 school Town didn’t want cost of new school Capacity: 300 K- Grade 5 Enrollment: 300 kids Construction cost: $9 million New wing, gutted restored old wing Done in one year kids moved to another school
24
Green innovations Automatic room lights Ambient light compensating lights Clerestory Double-glazed windows Photovoltaics Wind turbine
25
Green innovations, cont. Photovoltaics – supply part of power (enough for lights) Wind turbine – in wrong location; doesn’t supply power MTC funding SBA refund – 85% of construction cost
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.