Download presentation
Presentation is loading. Please wait.
Published byBrandi Hudkins Modified over 9 years ago
1
Boren School Preparing an existing wall to receive structural improvements
2
Boren School Plywood applied to existing wall for structural improvement
3
Boren School Beginning to frame kitchen area of the Child Care space
4
Boren School Kitchen area of the Child Care space framed and sheet-rocked
5
Boren School Cabinets ready for installation in kitchen area of the Child Care space
6
Boren School New ADA ramp under construction at north building entry
7
Boren School Landing and walkway poured at new ADA ramp at north building entry
8
Boren School New ADA ramp near completion at north building entry
9
Boren School Ceiling lowered in hallway to conceal structural improvements
10
Boren School Near completion of lowered ceiling in hallway
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.