Blossom Park Condominium Update Code Enforcement Division October 14, 2014
2
Blossom Park Condominiums Purpose Background Major Issues – Code Enforcement – Building Safety Division – Fire Marshal’s Office – Law Enforcement Summary
3
Blossom Park Condominiums Purpose Background Major Issues – Code Enforcement – Building Safety Division – Fire Marshal’s Office – Law Enforcement Summary
4
Purpose Condominium project with significant issues Make BCC aware of scope and magnitude of concerns and potential range of actions No action requested today
5
Blossom Park Condominiums Purpose Background Major Issues – Code Enforcement – Building Safety Division – Fire Marshal’s Office – Law Enforcement Summary
6
Background W. Landstreet Rd. Sand Lake Rd. SOBT Beachline Expressway Florida Turnpike Florida Mall Blossom Park Condo’s
7
Background C Landstreet Road Massey Cadillac Massey Cadillac South Orange Blossom Trail Beachline Expressway Shell Waffle House A B D EF G Entrance C
8
Background Originally Days Inn Motel Buildings constructed in 1973 – Concrete block main buildings – Wood structure walkways Hotel converted to condominiums in 2003 6 buildings – 3 stories – 345 units
9
Background Occupancy – About 175 occupied units (50%) – Approximately 250 residents Owner Make-up – 119 units (35%) owned by people who own multiple units Owner LocationNumber of UnitsPercent Blossom Park6920% Rest of Orange County8224% Rest of Florida5616% Other 49 States4814% Puerto Rico7321% Foreign175%
10
Background Single water and electric meters for entire complex – Electric – Duke Energy – Water - OUC – Waste-water - OCU Several times water shutoff imminent, bill paid
11
Background Receiver appointed in 2010 Similar responsibilities in court order for Tymber Skan Has not complied with notices from Building Safety or Code Enforcement Serious code violations such as failing exterior walkways not being addressed
12
Background Zoned I-1/I-5 – Condo plat recorded by State – Reflected as condo-hotel by OCPA Permits previously issued as hotel use Has not maintained license with DBPR as hotel since April 2006 Future Land Use Zoning
13
Background Review of Condo Declarations – No homestead allowed – No timeshare – No prohibition on children Zoning (hotel use) would allow short-term stays only, less than 179 days Based on lease agreements and license status, it does not appear to be managed as a hotel property
14
Blossom Park Condominiums Purpose Background Major Issues – Code Enforcement – Building Safety Division – Fire Marshal’s Office – Law Enforcement Summary
15
Major Issues - Code Enf. Code violations / Property Maintenance – Stairs, landings and walkways – Electrical and lighting Deteriorating stair systems (Bldg. A, B, C, D) Structural flooring and landing issues (Bldg. E, F G) A B D EF G C
16
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
17
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
18
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
19
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
20
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
21
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
22
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
23
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
24
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
25
Major Issues - Code Enf. Conditions Stairs, Landings & Walkways
26
Major Issues - Code Enf. Exterior Structural Violations – Non-functioning elevators – Hallway lighting – Gutters/downspouts – Failing walkways due to water damage – Unsafe stairways, handrails, guardrails – Graffiti Interior violations (14 units inspected) – No smoke alarms – Ceilings have water damage – Broken windows
27
Major Issues - Code Enf. Process cases to November 3, 2014 Special Magistrate – Compliance period – Reinspections – Possible fines/liens Conditions may require units on multiple floors to be vacated
28
Major Issues - Building Safety September 2013 complaint of unsafe conditions Issued notice of violation for Building C and G: – A structural engineering evaluation of the egress paths – Temporary shoring plans for Building G – Permits for all remedial repairs November 2013 received engineering evaluation A B D EF G C
29
Major Issues - Building Safety June 2014 complaint from OFM regarding unsafe conditions for Buildings E and F Issued notice of violation: – A structural engineering report – Certification of the electrical circuits in the corridor No response received to date. A B D EF G C
30
Major Issues - Building Safety County contracting for evaluation confirming unsafe condition determination by Code Enforcement All stairs, landings, and walkways Estimated to be completed in 6-8 weeks
31
Fire Rescue Incidents 123 Projected Incidents
32
Major Issues - Fire Rescue Fire and Life Safety Systems Structural integrity of emergency egress − Stairwells − Walkways Maintenance of exiting fire protection features − Hydrants − Standpipes − Fire alarm − Automatic Sprinkler System
33
Major Issues - Law Enforcement Crime Homicide (3) Aggravated Battery and Assault Burglary Stolen vehicles Sale or delivery (cocaine, heroin, cannabis) Unlawful possession Over 250 arrests YTD Mandatory patrols
34
Major Issues - Law Enforcement Calls for 9 months
35
Major Issues - Law Enforcement Crime NAB heard case on October 9, 2014 Required compliance agreement –No Trespass and No Loitering signs –Install / maintain security cameras –Criminal background checks on employees and tenants in Association controlled units –Evaluate security gate –Repair and maintain perimeter fence –Off-duty deputies for security –Other administrative requirements
36
Blossom Park Condominiums Purpose Background Major Issues – Code Enforcement – Building Safety Division – Fire Marshal’s Office – Law Enforcement Summary
37
Summary Hotel-condo conversion in 2003 345 units, half occupied Major issues – Code Enforcement – Building Safety Division – Fire Marshal’s Office – Law Enforcement
38
Summary Hearings scheduled – NAB held on October 9, 2014 – Special Magistrate scheduled for November 3, 2014 Contracting for Engineering Assessment Compliance schedule and actions subject to findings of hearings and assessment Strong concerns from Building Official and Fire Marshal