Download presentation
Presentation is loading. Please wait.
Published byAbril Went Modified over 9 years ago
1
2004 Campus Master Plan Extension
2
West Campus Phase 1 2008 Ellis Avenue Maryland Avenue 55 th 56 th 57 th 58 th 59 th Cottage Grove Drexel Avenue Proposed Phase 1 Phase 1 Renovations Proposed Phase 2 Existing Buildings BSD New Research Building PSD Renovations, Research Institutes and Searle Regenstein Library Addition UCH Pediatric Emergency Department IRB Chiller Expansion Stagg Field and Parking Structure Smart Museum/Court Theatre Expansion North Campus Residence Hall and Dining West Campus Chiller Plant PSD Computer Science, Astronomy & AstrophysicsBuildings UCH Surgery/Procedural/Bed Tower Future BSD Office Building Phase 2 2020 Regenstein Ratner DCAM NRB
3
Ellis Avenue Drexel Avenue 60 th 61 st Cottage Grove Ingleside Avenue Greenwood Avenue University Avenue Woodlawn Avenue Kimbark Avenue Kenwood Avenue Dorchester Avenue New Grad Harris Law 1155 SSA South Campus Phase 1 2008 Phase 2 2020 Midway South Winter Garden Midway Symbolic Bridges Demo BP Amoco Station Office/Parking at Drexel and 61 st South Campus Residence Hall & Dining Law School Tower Renovation Office/Retail/Parking at Woodlawn and 61 st 6045 S. Kenwood Renovation 61 st Utility Corridor Center for Creative and Performing Arts SSA Academic Expansion Law School Academic Expansion Harris School Academic Expansion GSB Portal and Residential Commons Hotel/Res./Parking at Stony and 61 st Proposed Phase 1 Phase 1 Renovations Proposed Phase 2 Existing Buildings
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.