Presentation is loading. Please wait.

Presentation is loading. Please wait.

Timetablers Forum Monday 9 July, 2012 8.8.47. 2013 Timetabling Timelines Phase 1 Timetable Preparation01/06/12 – 15/07/12 Central Office Tasks: Snapshot.

Similar presentations


Presentation on theme: "Timetablers Forum Monday 9 July, 2012 8.8.47. 2013 Timetabling Timelines Phase 1 Timetable Preparation01/06/12 – 15/07/12 Central Office Tasks: Snapshot."— Presentation transcript:

1 Timetablers Forum Monday 9 July, 2012 8.8.47

2 2013 Timetabling Timelines Phase 1 Timetable Preparation01/06/12 – 15/07/12 Central Office Tasks: Snapshot of 2012 data – 12 June Validation of Suitabilities for centrally managed teaching space Purge all ad hoc bookings Reset physical teaching space Add new locations and identify locations no longer required Preparation of 2013 database for WDC RMIT University©2012 Property Services, Space Planning and Management2

3 2013 Timetabling Timelines Phase 1 Timetable Preparation01/06/12 – 15/07/12 School Timetabler Tasks: Gather timetable information Commence preparation of timetables with key school staff Identify and add new modules (courses) for inclusion Confirm deleted courses RMIT University©2012 Property Services, Space Planning and Management3

4 2013 Timetabling Timelines Phase 2 – WDC Data Collection16/07/12 – 26/08/12 School Timetabler Tasks: Verification of all timetable requirements within WDC, includes semester 1 and 2 Confirm / delete classes for 2013 Addition of new classes for 2013 Update existing classes with new requirements for 2013 where necessary RMIT University©2012 Property Services, Space Planning and Management4

5 2013 Timetabling Timelines Phase 3 – Location Scheduling27/08/12 – 23/09/12 Central Office Tasks: Activities confirmed in WDC during Phase 2 are transferred to Syllabus Plus Timetable data analysed, and reported back to schools for correction: –Over constrained activities where no rooms match the requirements –Oversubscribed activities, where too many classes are requesting the same venue at the same time –Data gaps, no campus selected, no zone selected Classes scheduled and location priority groups: –Specialist spaces –Computer labs –Lecture theatres –Flat floor teaching spaces Scheduling reports provided to Schools after each group scheduled RMIT University©2012 Property Services, Space Planning and Management5

6 2013 Timetabling Timelines Phase 4 – Draft Timetable Review24/09/12 – 18/10/12 School Timetabler Tasks: Review allocations and scheduling from central timetable office Address timetable issues Draft review can commence from when the first report is received during Phase 3 Setting Section ID within Syllabus Plus for STS purposes RMIT University©2012 Property Services, Space Planning and Management6

7 2013 Timetabling Timelines Phase 5 –Timetable Published19/10/12 Higher Ed – Timetable published on STS TAFE – Timetable published on School website RMIT University©2012 Property Services, Space Planning and Management7

8 Web Data Collector 2.5 Improvements and Changes to the Interface True support for Jointly Taught Activities (STAs) RMIT University©2012 Property Services, Space Planning and Management8

9 Web Data Collector 2.5 Improvements and Changes to the Interface Student Sets RMIT University©2012 Property Services, Space Planning and Management9

10 Web Data Collector 2.5 Improvements and Changes to the Interface Identifying Service Taught activities RMIT University©2012 Property Services, Space Planning and Management10

11 Web Data Collector 2.5 Improvements and Changes to the Interface Reporting RMIT University©2012 Property Services, Space Planning and Management11

12 Web Data Collector 2.5 Improvements and Changes to the Interface Edit existing specialist classes RMIT University©2012 Property Services, Space Planning and Management12

13 Housekeeping Syllabus Plus Fat Client – issues and future Joanne Farruggia on leave during July  Nicole Eaton and Craig King only staff members in the central office  Refer school staff to the Web Room Booking system for ad hoc bookings  Refer to WDC manual for technical issues RMIT University©2012 Property Services, Space Planning and Management13

14 Printing and Reporting from Classic RMIT University©2012 Property Services, Space Planning and Management14

15 General Business/Open Forum for Questions RMIT University©2012 Property Services, Space Planning and Management15

16 Thank you for your Attendance RMIT University©2012 Property Services, Space Planning and Management16


Download ppt "Timetablers Forum Monday 9 July, 2012 8.8.47. 2013 Timetabling Timelines Phase 1 Timetable Preparation01/06/12 – 15/07/12 Central Office Tasks: Snapshot."

Similar presentations


Ads by Google