US Army Corps of Engineers Spill Response at Hydropower Projects
Ken Duncan Environmental Compliance Coordinator / Sustainability Program Manager Operations Division Technical Operations Branch Portland District
2
NWD Corps Missions Navigation Flood Damage Reduction
Restoring Ecosystems Hydropower Wetland / Waterway Regulation Recreation
5
Major Oil Sources: Kaplan Runner Up to 7,000 gal.
6
Governors (Up to 4000 gallons)
7
Transformers (Up to 16,000 gallons each)
8
Oil Storage Rooms (Up to 200,000 gallons per dam)
9
Navigation Locks
10
Navigation Locks (Up to a 1000 gallons)
11
Surface Flows – Dam Myths
12
Fishways
13
Oil Spill Prevention Containment Systems Sumps / Oil Water Separators
SPCC Plans
14
Spill Preparedness Training Drills Partnering w/ EPA, WDOE, DEQ
District IMT support Operations, Planning, Safety, PAO Contractor Response Using USCG BOAs
15
Spill Response - Reporting
Commanders Intent: “Projects shall report the potential or known quantity of materials spilled, as quickly as possible, and update immediately if information changes.” Corps policy is to report every spill. POC at each Project is the Control Room Listed in GRPs
16
Mid-Columbia Challenges
Corps needs to know about spills to protect the fish ladders Navigation Locks Mid-Columbia GRP
17
Questions? Contact Info: Ken Duncan