1
March 2010 Cross-sectoral cooperation and citizen engagement in slum upgrading Cross-sectoral cooperation and citizen engagement in slum upgrading
2
Area 248,6 km 2 645 municipalities Population: 41.05 million Area 248,6 km 2 645 municipalities Population: 41.05 million State of São Paulo Area 7.9 km 2 Municipalities 39 19.6 million inhabitants (47.9% of state total 50.33% do State GDP and 15.57 of national GDP HDI 0,828 (7th position among Brazilian MRs) Area 7.9 km 2 Municipalities 39 19.6 million inhabitants (47.9% of state total 50.33% do State GDP and 15.57 of national GDP HDI 0,828 (7th position among Brazilian MRs) MRSP Brazil Land area 8.547.403 km 2 26 States plus the Federal District Population:187 million Around 80% of the population lives in cities Land area 8.547.403 km 2 26 States plus the Federal District Population:187 million Around 80% of the population lives in cities MR of Campinas MR of São Paulo MR of the Baixada Santista
3
Population = 10.5 million inhabitants Area = 1.509 km² Districts = 31 Distances: North-South = 60 Km East-West = 39 Km CITY OF SÃO PAULO
4
Federal Constitution recognizes the dwelling as an “individual asylum” and as a “vital necessity of workers” Articles 182 and 183 and their regulation - Law 10.257/01, the City Statute United Nations Millennium Development Goals Halve, by 2015, the proportion of the population without sustainable access to safe drinking water and basic sanitation By 2020, to have achieved a significant improvement in the lives of at least 100 million slum dwellers Master Plan of the City of São Paulo “Suitable residence is that which guarantees security of possession to the dweller and offers adequate sanitary installations and, also ensures habitable conditions, being served by essential public services.” HOUSING POLICY
5
http:\\www.habisp.inf.br HABISP INFORMATION SYSTEM
6
http:\\www.habisp.inf.br LIST OF FAVELAS IN THE CITY OF SÃO PAULO
7
http:\\www.habisp.inf.br DETAILS ON EACH SETTLEMENT
8
WATER BASINS
9
Guidelines Minimum number of removals Priority to the elimination of risk areas Construction of Housing Units Construction of sewage networks Improving precarious access Enhancing the quality and quantity of leisure facilities Partnerships with other Municipal Secretariats, State Government and plot-owners SLUM UPGRADING PROGRAM
10
SLUM UPGRADING IN PARAISÓPOLIS
11
PARAISÓPOLIS, SÃO PAULO
13
AERIAL PHOTO - 1940
14
AERIAL PHOTO - 1954
15
AERIAL PHOTO - 1968
16
AERIAL PHOTO - 1977
17
AERIAL PHOTO - 1987
18
AERIAL PHOTO - 1994
19
AERIAL PHOTO - 2004
20
DIAGNOSIS OF AREA
21
Slum Total No of lots No of properties Use of properties Nº of persons Geographic area (m²) ResidentialNon-residential Paraisópolis 9.23617.14114.5382.60345.694822,739.4 Porto Seguro 306465415501.38524,862.2 Jd. Colombo 1.9333.2262.7774498.511148,091.9 TOTAL11.47520.83217.7303.10255.590995,693.5 Nº of families : 16,284 Residential use : 85.1% Demographic density: 590.43 inhab/ha HOUSEHOLD REGISTRATION SURVEY
23
COMMUNITY MEETINGS
26
MANAGEMENT COUNCIL
28
Organizations surveyed Paraisópolis43 Porto Seguro08 Jardim Colombo20 Total71 CIVIL SOCIETY ORGANIZATIONS
29
FORUM MULTIENTIDADES
30
PROJETO MAGIA DA REFORMA PARTNERSHIP WITH ABCP ASSOCIAÇÃO BRASILEIRA DE CIMENTO PORTLAND
31
COMMUNITY PARTICIPATION
39
Before the intervention: Grotinho risk area GROTINHO
40
Flooding of the area due to storms and the irregular occupation of land by constructions located in the flood-prone area (precarious access) (December 2005) Before the intervention: Grotinho risk area GROTINHO
41
Before the intervention: Grotinho risk area GROTINHO
42
Moving day Moving for rented houses or provisional accommodation Planning, programming and following-up the removals Moving for rented houses or provisional accommodation Planning, programming and following-up the removals GROTINHO
43
Executive design: Grotinho risk area GROTINHO
44
Recovery of the risk area using “stapling” techniques, realigning the slopes and opening the street Total removals: 182 families Families benefited: 32 Total removals: 182 families Families benefited: 32 Before and after the intervention: Grotinho risk area GROTINHO
45
Situation in February 2008: Grotinho risk area GROTINHO
46
Proposal: Grotinho risk area GROTINHO
47
COMMUNITY PARTICIPATION
49
GROTINHO
51
High risk of flooding and cavities Before the intervention: canalization of the Brejo Creek BREJO – LINEAR PARK
52
Opening streets and alleyways Canalization of the creek and constructing a pavement alongside, plus green and leisure areas. Removals foreseen :180 households and 308 ‘redistributions’ Basic design: canalization of the Brejo Creek BREJO
53
Project modified at the behest of the population Executive design: canalization the Brejo Creek BREJO
54
Presentation of the landscape and urban design BREJO
55
Appropriation of public space and environmental education BREJO
56
Appropriation of public space and environmental education BREJO
57
Appropriation of public space and environmental education BREJO
58
Appropriation of public space and environmental education BREJO
59
Situation in February 2008: canalization of the Brejo Creek BREJO
60
AVENIDA PERIMETRAL Condominium A Condominium BCondominium C Condominium D Condominium E Condominium G Condominium H CEI RESSETTLEMENT
63
Condominium C RESSETTLEMENT
64
Condominium D RESSETTLEMENT
65
RECREATIONAL SPACES
70
RECREATIONAL SPACES
71
RECREATIONAL SPACES
72
RECREATIONAL SPACES
73
RECREATIONAL SPACES
75
Maria Teresa Diniz Secretaria Municipal de Habitacão mtdiniz@prefeitura.sp.gov.br