Download presentation
Presentation is loading. Please wait.
Published bySonny Winnett Modified over 10 years ago
2
Mark Williams Facilities Engineering Manger Mike Joyner Project Manager - Power Services
3
Consolidation – Two Become One
5
College of Dental Medicine Cancer Research Center Health Sciences Building Medical Education Commons Building
7
Douglas Barnard Amphitheater Jaguar Student Activities Center
9
Norvell Golf House University Village
10
The Present Campuses Forest Hills – 312,000 Summerville - 854,000 Health Sciences – 2,898,000 3,000 Sq Ft
11
Reduction in personnel and positions Reduction in supply budgets Limited or no training for Facilities Personnel Aging and neglected campus infrastructure
12
i. Domestic Water i. Local Contractors and the City ii. Natural Gas i. Local Contractors and Natural Gas Supplier iii. Storm Water Systems i. Local Contractors and the City iv. Sanitary Sewer Systems i. Local Contractors and the City v. Electrical Systems i. Little to no local Contractor support dealing with High Voltage ii. Adequate Support located in Atlanta with no firm support in Emergency Situations
13
Georgia Regents University Electrical -13.8 KV Distribution Systems
14
Our Solution at Georgia Regents University Augusta
16
Power Services’ Total Maintenance and Repair Solutions Georgia Power’s Power Services can provide you with total maintenance and repair services for your privately owned medium and high voltage electric system. If you: - Own utility style medium & high voltage electrical equipment that is aging and needs constant attention or servicing... - Struggle to find capable resources for maintenance and repair of your electrical infrastructure... - Face the risk of losing capital or production if faced with a lengthy outage for maintenance or repair...
17
Power Services’ Total Maintenance and Repair Solutions Then Georgia Power’s Power Services can: - Offer you custom total maintenance and repair solutions. - Offer you 24/7/365 access to our statewide resources. - Provide expertise in Switch Gear and Breaker Maintenance - Electrical Engineering Design and Cost Estimates - Provide you with customized financial solutions allowing you to make needed upgrades now.
18
Mapping and Tagging the Electrical Distribution Systems Provides a geographical and electrically accurate map of the electrical system. Allows for safe and reliable switching of the high voltage system, minimizing outage impacts and restoration times. Upon contract execution - allows Georgia Power to add the electrical system to the system maps maintained by Georgia Power’s Control Center.
19
System Evaluation and Capital Improvements - Safety or Code issues that need to be addressed prior to a maintenance agreement. - Allows Georgia Power personnel to respond safely. - May require additional training for GPC personnel.
20
TMR Agreement - Provides single point of contact for electrical outages. - Access to GPC stocked materials at various locations across the State. - Pro-active maintenance and repairs to reduce unplanned outages. - 24/7 /365 response by qualified Georgia Power Personnel
21
Mark Williams Facilities Engineering Manager 706-721-0562 markwilliams@gru.edu Mike Joyner Project Manager – Power Services 912-306-1761 mtjoyner@southernco.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.