Stockholm Arlanda and Bromma Airports and their future role Reykjavik 2012-01-19 Henrik Littorin Senior Analyst henrik.littorin@swedavia.se +46 734 33 19 98
2
2 The long-term agreement at Bromma Stockholm Airport The environmental permit and restrictions at Stockholm Arlanda Airport The economic importance of Arlanda and Bromma Airports The logic behind two airports in the capital area Future strategies for the airports Topics
3
Swedavia’s role and task Founded 2010 as a consequence of the breakup of LFV Group. Develop the transport sector and help achieve Swedish transport policy goals based on sound business principles. Return on equity of 9 per cent required. 10 airports in the national basic airport infrastructure, from Malmö in the south to Kiruna in the north.
4
4 Bromma 2,2 mpax (2 domestic, 0,2 international) 68 000 movements (66% scheduled and charter) 15 domestic 4 international City centre airport Arlanda 19 mpax (4,7 domestic, 14,3 international) 213 000 movements (99% scheduled and charter) 32 domestic 140 international Hub airport with large regional cathment area
5
Bromma Stockholm Airport - History 1936 – Inaugurated 1946 – SAS is founded and base their Swedish operations at Bromma. 1962 – International flights move to the newly built Arlanda Airport. 1983-1992 – No scheduled operations at Bromma. 1994 – Permission for operations until 2011 – domestic operations return. 1994 – 2008 Almost no investments made due to uncertainty about the future. 5
6
The long-term agreement at Bromma Stockholm Airport Old permit valid until 2011 Either invest in the airport or close it and use the area for houses and recreation purposes. Autumn 2007 National Airport Commission releases Official Government Report which says: ”Bromma is a strategic Swedish airport” Spring 2008 A long-term agreement between Swedavia (then LFV) and the City of Stockholm for the period 2008 – 2038. Fierce debate and required a political decision to gain legal validity. 6
7
The long-term agreement at Bromma Stockholm Airport Number of movements, emissions and noise limits determined. Infrastructure in the area now being planned with consideration to the airport. 0,5 Euro per departing passenger paid to the City of Stockholm as ground rent. 7
8
The environmental permit and restrictions at Stockholm Arlanda Airport Major limitations of aircraft movements from 2018. Ground transportation part of the permission. No approaches over the urban area Upplands Väsby will decrease capacity with 50 % in peak hours! The airport has applied for a new permission – final decision probably within 4 years. 8
9
The economic importance of Arlanda and Bromma airport Extensive research has been done in this area. The major argument to justify the airports. 9
10
Economic importance of Bromma Strengthened since Arlanda has no available slots in peak. Focused on business trips and domestic accessibility. The value of companies being able to travel quick and easy. Value of time saved by travelling from Bromma = 10 million Euros/year. Value of scheduled services at Bromma = 150 million Euros/year. Commercial activity at Bromma = 2,5 million Euros/year. Employment at Bromma = 35 million Euros/year. 10
11
Economic importance of Arlanda National importance (international access and hub function). 20% visitors from abroad or other parts of Sweden. Visitors spend more than 4 million Euro/day in the region. Crucial for international accessibility exports share of Swedish GDP = 50%. Increasing importance of the airport for companies (increasing share of foreign owned companies). Catalyst for other sectors in society – economy, culture, recreation, knowledge exchange, cultural exhange, meeting family and relatives. Many factors hard to value in monetary terms. 11
12
The logic behind two airports in the capital area Bromma is an extreme peak airport. Constrained capacity in peak hours at both airports. None of the airports have available slots in the morning peak. Limited suitable infrastructure at Arlanda to handle the aircraft types that operates at Bromma. = Impossible to move present operations from Bromma to Arlanda. No other airport close to Stockholm that can handle business aviation. 12
13
Bromma – 70% Business, 30% Leisure. Arlanda – 40% Business, 60% Leisure. Much higher share of very frequent, commuting and well prepared passengers at Bromma. Short distances, short check-in times and almost no security queues at Bromma. Much shorter travel time door-to-door at domestic routes from Bromma than at Arlanda. Bromma caters for business aviation, air ambulance, governmental and official aviation operations – not suitable to mix with scheduled jet operations at a slot controlled airport like Arlanda. 13 The logic behind two airports in the capital area
14
Future challenges at Bromma Airport No available slots in peak hours. Maximum number of jet movements almost reached. New, larger and quiter aircrafts needed to meet passenger demand. Huge investment program (massive renovation and some expansion). Light railway connecting the airport in 2017. Hotels, conference facilities and large shopping areas being built in the surroundings. Relocation of general aviation (hostile debate and requires political decision). 14
15
Future challenges at Arlanda Airport A new permission for the airport operations. Increase the passenger experience and passenger process. Large and outstretched terminal system – expensive and creates logistic problems. Improve ground transportation to and from the airport. Catch the increasing passenger flow from Asia to Europe (fierce competition with other major airports in Northern Europe). 15
16
Summary A capital area have many different air transportation needs. Difficult to mix all kind of airport operations at one airport. Peak traffic is a major challenge. Bromma relieves Arlanda. Major challenges at Bromma: Noise, safety, interaction in the city planning and managing general aviation and business aviation. Never optimal to integrate an airport in an urban area. Long term institutional stability important either if it is ”good” or ”bad”. 16