Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International.

Similar presentations


Presentation on theme: "1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International."— Presentation transcript:

1 1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International Road pumping stations 4.Grouting of 18km of twin pumping mains (660mm to 950mm dia) Sewerage Schemes to serve Developments in Jurong Eastern Catchment and Jurong Lake District Objective  Extend sewers to serve new developments & phase out 4 pumping stations

2 2 Sewerage Schemes to serve Developments in Jurong Eastern Catchment and Jurong Lake District

3 3 Expected Calling Date – December 2010 1.Package A – Proposed Sewers along Yuan Ching Road 500mm dia sewer – 1.2km 900mm dia sewer – 1.3km 2.Package B (Contract 1) – Proposed Lift Station at Jurong Town Hall Road 300 l /s capacity lift station Expected Calling Date – January 2011 1.Package B (Contract 2) – Proposed Sewers along Jurong Town Hall Road 300mm dia sewer – 750m 500mm dia sewer – 1.5km 900mm dia sewer – 700m Sewerage Schemes to serve Developments in Jurong Lake District

4 4 Expected Calling Date – February 2011 1.Package A (Contract 1) – Proposed Sewers along Pioneer Road and Jalan Ahmad Ibrahim 3000mm dia sewer – 3.1km 2.Package B – Proposed Sewers along Jalan Boon Lay 3000mm dia sewer – 3.2km Expected Calling Date – March 2011 1.Package A (Contract 2) – Proposed Sewers along Jurong West Avenue 2 2500mm dia sewer – 2.5km Sewerage Schemes to serve Developments in Jurong Eastern Catchment

5 5 Expected Calling Date – April 2011 1.Package C (Contract 1) – Proposed Lift Station at Jurong Water Reclamation Plant 164,000 cmd capacity lift station Expected Calling Date – May 2011 1.Package C (Contract 2) – Proposed Sewers along Jalan Tukang and International Road 2000mm dia sewer – 1.9km Sewerage Schemes to serve Developments in Jurong Eastern Catchment


Download ppt "1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International."

Similar presentations


Ads by Google