Download presentation
Presentation is loading. Please wait.
Published byBruno Havill Modified over 9 years ago
1
1 Collection System And Wastewater Treatment Plant Sewer Update - 2014
2
2 Planning Documents Sewer Master Plan (2008) 15 yr plan As-built drawings, prior studies’ data, sewer TV inspection logs, data from operators Discharge Permit 5 yr cycle Based on “Basin Plan” (State Water Board)
3
3 Funding Sewer Enterprise Fund Loans SRF, USDA, etc… Grants Fewer available Demographic and/or geographic requirements
4
4 Maintenance & Capital Improvement City = regular scheduled maintenance, minor repairs Contractor = larger projects (line rehabilitation, replacement, facility upgrades)
5
5 Collection System Highlights 29 miles of sewer pipe 5 lift stations (10 pumps) NEWCSD
6
6 Sewer Pipe Age as Percent of System
7
7 Collection System Challenges Age Roots Grease Infiltration and Inflow Improperly Installed Laterals Cracking, missing pipe, deflection, etc…
8
8 Capital Improvement Priority and Cost
9
9 Wastewater Treatment Plant Highlights First constructed in 1948, upgraded in 1992 & 2006 Grade IV, tertiary treatment facility Beneficial re-use of discharge (GCID & Sacramento National Wildlife Refuge) 0.8 MGD average, permitted to 1.2 MGD (ADWF) 5 lift stations, 4 distinct treatment processes Operated & maintained by Severn Trent Services
10
10 Wastewater Treatment Plant Challenges Aging infrastructure Permit Compliance MUN Beneficial Use = Time Schedule Order to comply Compliance spearheaded by State, Cities assist/support Colusa, Biggs, Live Oak, Willows De-designate beneficial use on waterways through Basin Plan Amendment = permit issue solved
11
11 Permit Compliance Timeline
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.