Water Services Training Group WRc FOG Project Engineering/Operations Issues
2
Andy Drinkwater/Frank Moy FOG Team WRc
3
WRc FOG Project Work Package 1: Legal Work Package 2: Sociological Work Package 3: Biological/chemical Work Package 4a: Engineering – designing FOG out (sewers/ pumping stations, grease separators) Work Package 4b: Operations – cleaning techniques etc (sewers/ pumping stations)
4
Engineering/Operations Issues Grease separator selection Products database Jetting and cleaning of FOG from sewers Sewer design Pumping station design
5
FOG Work Package 4 - Deliverables Reports Operational Problems caused by FOG Guidance document on Sewer Cleaning and Blockage Removal Techniques Factors that Influence FOG Accumulation on Sewer Pipes Design to Minimise FOG Deposition and Associated Operational Disruption Review of Use of Grease Separators Grease Separator Advice
6
FOG Work Package 4 - Deliverables FOG Strategy – various advice sheets and leaflets, including: Grease separator advice Operational guidance – improved cleaning procedures Design guidance for sewers and pumping stations Guidance for improving existing sewer systems and pumping stations
7
Large number of different types of separator are now commercially available Many are not of the traditional design and, as such, are not covered, by a standard However, many of the new designs show promise and deserve further investigation Grease separator selection
8
Grease separator selection (2) When considering new types of separator, look at: Their practicality - ease to install, where to install, ease to maintain/clean etc Their overall effectiveness Guidance given by manufacturers/ suppliers etc – size/installation etc
9
The standard (EN 1825) Difficult to understand (information spread between Part 1 and Part 2) Only considers conventional ‘large’ underground separators – Not practical for most town centre catering outlets No consideration of more recent separator designs, including skimmers. Grease separator standard
10
Grease separator standard (2) The standard (EN 1825) Does not consider hybrids – Dosing and separators Most separator suppliers don’t understand EN 1825 ● Suppliers have a variety of sizing methods ● Seems to be little standardisation but plenty of confusion ● Often, sizing is only for the food trap part of the separator
11
EN 1825 separator
12
Active separator (skimmer)
13
Grease separator selection Three main issues to consider: Location/access Size Maintenance Each property is unique Selection is an iterative process may need combination of separator/ biological solution
14
Grease separator selection Location Close to source – connect all sources ( dishwashers issue ) Far enough away for effluent cooling Upstream of other inputs (rainwater and foul water) Outside units preferable - Consider internal units at properties with no external space Enable access for cleaning/maintenance
15
Grease separator selection Size To provide adequate retention time for separation to take place - determined by: ● Flow rate to the separator ● Volume of FOG in discharge ● Maintenance frequency v size
16
Grease separator selection Maintenance By whom Staff – small separators, easy access, cleaning record, storage of wastes Contractor – for larger underground separators, less frequent visits, vactor units remove wastes from site Frequency – determined by storage capacity of the separator
17
Inadequate grease separators Examples of two small and poorly maintained separators
18
Products database Database including details of: Grease separators and Biological treatments Product/company name Contact details for products Basic product information Guidance on appropriate applications Available to contributors and their agents through password access
19
Jetting and cleaning The most frequent symptom of FOG in the sewer system is a blockage Sewer blockages may occur at any point on the sewer system, from the point of source to the wastewater treatment works Sewer blockages can be categorised as a primary or secondary blockage
20
Jetting and cleaning Primary FOG related blockages are due to natural deposition of FOG at a specific location as a result of the combination of: a source and appropriate type of FOG, concentration of FOG in the flow, the natural processes of separation, and hydraulic conditions
21
Jetting and cleaning Secondary FOG blockages are those that occur as a direct result of a previous blockage or severe flow restriction. Flow velocity upstream of the original blockage will reduce - FOG that would otherwise remain in the flow will separate out. FOG will be high on the pipe wall or in the crown of the upstream pipe, due to the increased depth of flow Sewer debris, (sanitary towels and other sewage debris) then sticks to the FOG on the crown of small pipes, a secondary blockage subsequently develops
22
Jetting and cleaning practice The following may seem obvious BUT experience often shows otherwise ! All FOG related blockages must be effectively cleared and the upstream pipe effectively cleaned to prevent repeat incidents A recommended procedure has been proposed to ensure effective cleansing
23
Jetting and cleaning practice (2) General purpose jets are a compromise Removal of FOG from a sewer should be carried out as a staged and incremental process 1. General purpose jet to remove soft debris 2. Plough to remove hard sediments, 3. Spinning jet to remove FOG 4. Survey with a camera
24
Jetting heads
26
Jetting and cleaning practice (3) Analysis shows that the correct cleaning practice will be beneficial in terms of: Reducing the number of operational disruptions Improving customer satisfaction Cost effectiveness
27
Jetting and cleaning Before and after using recommended procedure
28
Jetting and cleaning practice (4) Should the dislodged FOG be: Removed at the manhole: or Passed forward ? No evidence of significant problems if:
29
Jetting and cleaning practice (5) Break fragments into small pieces, remove large fragments Remove large quantities Remove if FOG is mixed with sediment
30
Jetting and cleaning practice (6) Remove if downstream problems may occur Notify operators of pumping stations and works of the possibility of dislodged FOG being passed downstream
31
Jetting and cleaning practice
32
Sewer design Greater likelihood of FOG deposition/ adherence: Higher concentration of FOG Lower the temperatures of the pipe surfaces Slower the velocity of flow/movement of effluent
33
Existing sewer improvements (1) First option – control FOG at source Good kitchen practice Install grease separators and/or Biological treatment systems Modest improvements to drainage system to reduce areas with low velocity Other measures: Improve sewer cleaning/blockage practice Consider off line, as opposed to on-line tanks
34
Existing sewer improvements (2) Modest improvements to drainage system to reduce areas with low velocity: Removal of Buchan traps Relay pipes with sags, to enable positive gradient Removal of tree roots Make good intruding laterals (use of saddle connections etc) Improve benching/pipe layout in manholes Install drop pipes to high level connections
35
Existing sewer improvements (3) Where existing systems need to be altered to reduce CSO spills etc, ensure that the ‘improvement’ will not result in areas of low velocity/tranquil flow where serious FOG deposition could occur. Similarly, where storage needs to be added to reduce sewer flooding (These may seem obvious, but they have happened)
36
New sewer design to avoid FOG The following should be done as good practice, to ensure there are no areas with very low velocity: Pipe velocity, 0.6 m/s or greater Use minimum number of pipe joints (joints dissipate energy in small flows) Use easier to clean pipe materials Good detailing of connections (saddles etc) Good detailing in manholes
37
New sewer design to avoid FOG Also: Avoid flow control devices If tanks are necessary, use off-line systems
38
Pumping station design Greater likelihood of FOG build up with: Higher concentration of FOG Low velocity/movement in the wet well: ● More tranquil the effluent in the wet well ● If there are dead zones in the wet well
39
Existing pumping station improvements (1) Where possible, remove dead zones Remove redundant/non essential equipment Remove baffles from incoming flows Consider re-profiling wet well floor Ensure effluent is mixed at start of pump down
40
Existing pumping station improvements (2) Refit with easy clean materials Replace fouled float switches with ultrasonics (located clear of the effluent) Use varying pump on/off levels, to avoid FOG shelves at ‘pump on’ level Improve access to wet wells, for cleaning purposes Review pump regimes to reduce FOG deposition in rising mains
41
Problem pumping station
45
New pumping station design (1) Greater likelihood of FOG build up: Higher concentration of FOG Low velocity/movement in the wet well Ensure wet well does not have dead zones
46
New pumping station design (2) Avoid dead zones: Use circular wet wells Use deep/small diameter wet wells – better mixing Avoid excessive use of equipment in the wet well Minimise use of dividing walls Make use of energy/turbulence caused by incoming flow Use of non stick materials
47
FOG Work Package 4 - Deliverables Reports Operational problems caused by FOG Guidance document on Sewer Cleaning and Blockage Removal Techniques Factors that Influence FOG Accumulation on Sewer Pipes Design to Minimise FOG Deposition and Associated Operational disruption Review of Use of Grease Separators Grease Separator Advice
48
FOG Work Package 4 - Deliverables FOG Strategy – various advice sheets and leaflets, including: Grease separator advice Operational guidance – improved cleaning procedures Design guidance for sewers and pumping stations Guidance for improving existing sewer systems and pumping stations