STATUS OF CARLSBORG SEWER PROJECT Carlsborg Community Advisory Council Bob Martin June 6, 2013
2
UPDATE SINCE LAST CCAC MEETING Conditional Approval of Facility Plan by Ecology The PUD Board has decided to withdraw from most aspects of the project. The PWTF loan has been executed and assigned to the County. Wastewater treatment and reuse in Sequim
3
Reasons to Consider Treatment in Sequim: Sufficient excess capacity exists at Sequim WRF. Only minor upgrades to Sequim collection system needed to accommodate Carlsborg flow. Less than 3 miles of 6” force main needed to connect. “State of the Art” facility producing Class A reclaimed water. Good record of consistently meeting permit standards. Sequim aggressively pursuing utilization of reclaimed water. Resolves siting issues in Carlsborg. Cost Savings Sufficient excess capacity exists at Sequim WRF. Only minor upgrades to Sequim collection system needed to accommodate Carlsborg flow. Less than 3 miles of 6” force main needed to connect. “State of the Art” facility producing Class A reclaimed water. Good record of consistently meeting permit standards. Sequim aggressively pursuing utilization of reclaimed water. Resolves siting issues in Carlsborg. Cost Savings
4
Preliminary Sequim Cost Proposal 1.Capacity Cost: Proportionate Share of depreciated cost of shared treatment facilities (Approx. $1.2-1.5 million for 20-year Carlsborg flow projection. 2.Treatment O&M: $0.01 per gallon 3.Collection system O$M: $2.12 per foot on approx. 15,000 feet of shared sewer lines 4.10-15% surcharge on Treatment & Collection O&M
5
Present Worth – 20 Years (X $1,000) Cost ComponentFacility Plan (Carlsborg Rx) Sequim Treatment & Reuse Capital Cost – Rx and Reuse$ 5,860$ 3,460 Carlsborg Collection$ 9,719 Expansion Cost$ 0$ 532 Subtotal: Capital Cost$ 15,579$13,711 O&M Present Worth – 20 yr$ 5,750$ 4,577 Total Present Worth$21,329$18,288 Notes: 1) Assumes constant 2012 dollars and 0% discount. 2) Assumes Purchase of 20-Year Capacity in two increments.
6
Source: Comparison of Costs for Wastewater Management Systems Applicable to Cape Cod, Barnstable County Wastewater Cost Control Task Force, April 2010. Carlsborg – Initial Sequim WRF - 2011
7
UPDATE SINCE LAST CCAC MEETING Conditional Approval of Facility Plan by Ecology The PUD Board has decided to withdraw from most aspects of the project. The PWTF loan has been executed and assigned to the County. Wastewater treatment and reuse in Sequim Evaluation of conveyance route to Sequim
8
Sequim Conveyance Options 1.Crossing at RR Bridge 2.Old Olympic Highway 3.Directional Drilling 4.Crossing at SR 101 Bridge 5.Utility Bridge
9
Conveyance Options
10
UPDATE SINCE LAST CCAC MEETING Conditional Approval of Facility Plan by Ecology The PUD Board has decided to withdraw from most aspects of the project. The PWTF loan has been executed and assigned to the County. Wastewater treatment and reuse in Sequim Evaluation of conveyance route to Sequim Request for Proposals for Engineering Consultant
11
RFP WORK TASKS 1.Design the initial Carlsborg Collection System
13
RFP WORK TASKS 1.Design the initial Carlsborg Collection System 2.Amend the Facility Plan to reflect treatment and reuse in Sequim 3.Evaluate options and costs for expansion of the PUD Carlsborg Water system to the entire UGA
15
NEXT STEPS: Connection Policies and Costs – Priority Inter-local Agreement between County and City of Sequim Design Conveyance system to Sequim Construction – completion by end of 2015
16
Project Timeline