Welcome “Sewers – The Key to Hauppauge Revitalization: The Next Economic Boom ” 1 June 23, 2010
2
SUFFOLK COUNTY SEWER DISTRICT NO. 18 HAUPPAUGE INDUSTRIAL- SEWER CONNECTIONS BEN WRIGHT, P.E. SUFFOLK COUNTY DPW JUNE 23, 2010
3
APPLICATION INFORMATION Estimated cost of construction Copies of water bills Plan –existing and proposed Survey form Pool Closure Structure certification
4
COMMERCIAL ACCOUNT SURVEY IDENTIFY WATER AUTHORITY OFFICE LISTING OF TENANTS WITH WATER ACCOUNT AND FIRST DATE OF OCCUPANCY SHIFTS AND PERSONNEL/SHIFT INDUSTRIAL PROCESSES SOURCES OF WASTES/WASTEWATER
5
POOL CLOSURE REPORT SUFFOLK SANITARY CODE/HEALTH DEPARTMENT APPLICATION HISTORY SAMPLING, IF NEEDED INSPECTION APPROVAL TO DPW
6
BUILDING CONNECTION PERMIT OBTAIN ALL REQUIRED PERMITS USE REGISTERED CONTRACTORS FOLLOW SUFFOLK COUNTY CODE 424 SITE INFORMATION HAZARDOUS MATERIALS PERMIT TYPE OF FACILITY
7
CONNECTION APPLICATION PROCESS Application submitted Application and plans reviewed – Acceptable – copies sent to IWU – Unacceptable – notice sent to applicant IWU review for pre-treatment – Acceptable – notice to permit office – Applicant informed to notify permit office Health Services notified of project
8
INSPECTION PROCESS Additional Submittals – Contractor information – Road opening permit – Cesspool closure from Health Dept. – Inspection Fees Fee sent to Finance Work Scheduled Connection Completed
9
INSPECTION PROCESS - continued Discharge allowed when: – Final connection inspection completed – Finance approves release – As-Builts approved – Industrial waste inspection completed – Discharge permit issued
10
DISCHARGE PERMIT CATEGORIES SIGNIFICANT INDUSTRIAL USERS – B-COMPATIBLE PROCESS WATER – HB – HAULED FOR DISPOSAL – SC-MONITORING FOR EXCESS STRENGTH – A1-O DISCHARGE BUT SUBSTANCES OF CONCERN NON-SIU – A’S-GREASE,LINT, SILVER RECOVERY – MO-MULTIPLE OCCUPANTS WITH SANITARY
11
FEDERAL CATEGORICAL INDUSTRIES FEDERAL WEBSITE INDUSTRIES – PHARMACEUTICAL – METAL FINISHING SAMPLING AND ANALYSIS WITHIN 90 DAYS
12
SPECIAL NOTES Local Law 424- Sewers Inspection before backfill Construction methods/materials NYS Industrial Code Rule 753 Sewer/water location Permits on site
13
APPLICATION FEES Permit Office - $100 Industrial Waste Office - $10 Construction Inspection – 1% cost of the project or – $300 minimum or – $500 minimum if pretreatment structures involved
14
ASSESSMENT STABILIZATION RESERVE FUND LOCAL LAW 35-1999 RESOLUTION 650-2000 RESOLUTION 770-2007 NOVEMBER 30, 2030/25% LIMITS IMPACT OF ANY CAPITAL PROJECT TO 3% PER YEAR
15
COST ELEMENTS CAPITAL COSTS/DEBT SERVICE OPERATION AND MAINTENANCE INDUSTRIAL WASTE CHARGE EXCESS STRENGTH
16
SEWER RATES ASRF – 3% PER YEAR BENEFIT RATES – PER 1,000 GALLONS INDUSTRIAL WASTE CHARGE – PER 225 GALLONS EXCESS STRENGTH – BOD,SOLID, CHLORINE DEMAND AVERAGE AND MEDIAN COSTS - ~$9,500 AND $4,500
17
EXCESS STRENGTH SURCHARGE Current thresholds BOD 300mg/l Solids 300mg/l Chlorine 25mg/l Demand Future thresholds 1,000mg/l 750mg/l 25mg/l
18
EXCESS STRENGTH CHARGES BOD - $0.118/pound SUSPENDED SOLIDS - $0.083/pound CHLORINE DEMAND - $0.065/pound
19
POTENTIAL BENEFIT CHARGE Current/projected 2011 - $14.32 2012 - $14.75 2013 - $15.19 2014 - $15.65 2015 - $16.12 2016 - $16.60 2017 - $17.10 Potential 2011 - $14.32 2012 - $14.75 2013 - $15.19 2014 - $15.65 2015 - $12.00 2016 - $12.36 2017 - $12.73
20
CONTACTS Joe Farina – Connection Permit Section – 854 -4185 Diane Booth – Industrial Waste and Pretreatment Discharge Permit Section – 852-4160 Ben Wright – Engineering/Project – 852-4205
21
FEASIBILITY ANALYIS Research zoning classification and requirements of subject property (i.e., parking & loading, setbacks, signage, planted buffers, etc.). Prepare preliminary site plan with proposed building/ addition. Meet with planning department to discuss proposed application and determine critical design issues and whether or not there is anything about your application that may require Board of Zoning Appeals (BZA) relief.
22
SITE PLAN APPROVAL SITE PLAN APPROVAL Engineering plans (site grading, storm drainage, etc.) Architectural floor plans, building elevations, colored rendering, materials board Landscape Plan Environmental Assessment Form Appropriate Fees
23
OTHER REVIEW AGENCIES SCDHS Office of Wastewater Management- Commercial application (water supply & sanitary sewage) SCDHS Office of Pollution Control- Understand obligations at industrial and commercial sites related to Articles 7 &12 regarding storage of toxic/hazardous materials SCDPW Division of Sanitation- regarding permissions to connect to a County sewer district SCDPW Highway Group- Separate approval required for properties with frontage along a County roadway Old Willets Path Vanderbilt Motor Parkway