1 Mantoloking & Super Storm Sandy. 2 AGENDA: Overview Current Status Short-Term Plan Long-Term Plan Resources.

Similar presentations


Presentation on theme: "1 Mantoloking & Super Storm Sandy. 2 AGENDA: Overview Current Status Short-Term Plan Long-Term Plan Resources."— Presentation transcript:

1 1 Mantoloking & Super Storm Sandy

2 2 AGENDA: Overview Current Status Short-Term Plan Long-Term Plan Resources

3 Mantoloking & Super Storm Sandy – Current Status INFRASTRUCTURE: STATE DOT Project: Finished Working traffic light on Herbert Guardrails in place Sidewalks, curbs, grass (!?!)

4 Mantoloking & Super Storm Sandy – Current Status INFRASTRUCTURE: DEBRIS REMOVAL: 26,000 tons to date Continuous Private Property Debris Removal (including demolition) under discussion with FEMA. SAND REMOVAL/RE-USE: Army Corps dredging Lyman Temporary sifting station will be in place immediately after dredge work is complete.

5 Mantoloking & Super Storm Sandy – Short-Term Plan Access: New Access System in place Priority: First Responders / Residents Contractors next

6 Mantoloking & Super Storm Sandy – Short-Term Plan Administration: Tax reassessment- Complete assessment by Property by March, 2013 Prepare for Reconstruction: Planning Board considering new zoning req’s based on revised elevation guidelines from FEMA (issued last week) Streamline permit process Planning Board working with Borough: Resolution being drafted allowing: PODs, RVs, Boats, etc.

7 7 Mantoloking & Super Storm Sandy UTILITIES (Current Status): Sanitary Sewer Over 15,000 lf (3 miles) of sewer main cleaned and inspected Force main pressurized and discharging clean water to OCUA Water 90% of main restoration complete Pressure testing and water quality testing for 8” main on Rt. 35 Gas 70% of main restoration complete Portion of Barnegat Lane and Lagoon/Channel not pressurized Electric 85% of distribution grid energized Areas around Barnegat Lane and Herbert St breach not energized

8 Mantoloking & Super Storm Sandy UTILITIES (Short Term Planning): Sanitary Sewer Complete the remainder of sewer main CCTV inspection/cleaning Install temporary pump system at Herbert Street Water Repair damaged fire hydrants Install new services for properties off of new 8” main in Rt 35 Gas Pressurize and perform full assessment of Lagoon/Channel area Replace 2” main on Barnegat Lane Electric Complete the replacement of overhead distribution Ensure safety policies remain in place throughout restoration work

9 9

10 10

11 11

12 12

13 13

14 Mantoloking & Super Storm Sandy – Happy Holidays