Download presentation
Presentation is loading. Please wait.
Published bySalvatore Osler Modified over 9 years ago
1
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013
2
Street Reconstruction Program
3
Study Area Pullman Avenue 2 nd Street to 6 th Street: 3 rd Street Pullman Avenue to 13 th Avenue
4
Existing Conditions Pullman Avenue (2 nd Street to 3 rd Street)Pullman Avenue (4 th Street to 3 rd Street)
5
Proposed Street Improvements: Pullman Avenue Complete Street Reconstruction 2 nd Street to 3 rd Street: 36’ wide 3 rd Street to 6 th Street: 44’ wide Concrete Curb and Gutter 2 nd Street to 3 rd Street: install new 3 rd Street to 6 th Street: remove and replace Concrete Sidewalk 3 rd Street to 6 th Street on north side
6
Proposed Utility Improvements Sanitary Sewer Improvements Pullman Avenue between 2 nd Street and 6 th Street Upgrade existing facilities to accommodate trunk sanitary sewer Water Main Improvements Pullman Avenue between 3 rd Street and 6 th Street Maintenance records indicate numerous breaks Frequency of breaks typically increases in cast iron pipe (CIP) water main more than 40 years in age Storm Sewer Improvements Pullman Avenue Replace as necessary to install sanitary sewer and water main 3 rd Street Standing water/icing in street Accelerated pavement deterioration Road patching as necessary to install storm sewer
7
Project Costs Total Estimated Project Cost:$1,460,690 Pullman Avenue Street and Storm Sewer$863,690 Sanitary Sewer and Water Main$475,100 3 rd Street Storm Sewer$121,900
8
Project Funding Total Estimated Project Cost:$1,460,690 Street and Storm Sewer Assessments$195,540 Utility Assessments$13,000 City Utility Funds$618,200 City CIP Funds$633,950
9
Estimated Assessments Residential (33%) Per front foot $94.65 Assessments Range: $1,100 - $9,500 Average: $4,500 Commercial (40%) Per front foot $131.67 Assessments Range: $3,300 - $13,200 Average: $6,300
10
Similar Projects 10
11
Preliminary Project Schedule Neighborhood Open House Nov. 7, 2013 Present Feasibility Report to City CouncilNov. 18, 2013 Project Public Hearing/Order ProjectDec. 16, 2013 Approve Plans/Authorize BidsFeb. 2014 Assessment HearingMay 2014 ConstructionJune–Sept. 2014 First Payment with Property TaxesMay 2015
12
2016 Proposed Improvements Complete Street Reconstruction 36’ face-to-face of curb Concrete Curb and Gutter Install new
13
2016 Proposed Utility Improvements Sanitary Sewer Improvements 2 nd Street between 11 th Avenue and Pullman Avenue Upgrade existing facilities to accommodate future trunk sanitary sewer for River’s Edge development to the south Storm Sewer Improvements Address flat slopes to ensure proper drainage 11 th Avenue between 2 nd Street and 3 rd Street 2 nd Street 1st Street – between 10 th Avenue and 11 th Avenue Sitlow Park drains to rock garden installed by Public Works Storm water remains in rock garden until it has infiltrated Rock garden has been know to hold water for several days Road patching as necessary to install storm sewer
14
Next Steps: Resolution to Accept Feasibility Report and Set Public Hearing Date and Time Proposed Public Hearing December 16, 2013
15
Questions???