Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014
2
Introductions Doug Helt, P.E. City of Tulsa Transportation Lead Brooke Caviness, P.E. City of Tulsa Senior Engineer / Project Manager Tim Morgan, P.E. HNTB Corporation Project Manager
3
Project Location Map
4
Overview Roadway Improvements Stormwater Improvements Water Main Improvements Sanitary Sewer Improvements Anticipated Project Schedule Questions
5
Roadway Improvements Roadway Geometry Improved = Safer Drive
6
Roadway Improvements 35 mph Speed Limit Median Separation Through Park Lane Widths Increased New Lighting (LED)
7
Roadway Improvements
8
Stormwater Improvements Travis Park RCB System Swan Creek RCB System Crow Creek Bridge Replaced Riverside Drive Storm System Upgraded
9
Stormwater Improvements Pre-Project Storm Conveyance System
10
Stormwater Improvements Post-Project Storm Conveyance System
11
Water Main Improvements Riverside Drive 12” Water Main Gathering Place 8” Water Main Creating Looped Water Main Systems Improved Function and Flow in Neighborhoods
12
Water Main Improvements Pre Project Water Main Network
13
Water Main Improvements Post Project Water Main Network
14
Sanitary Sewer Improvements Existing Systems are 60-100 years old Reconstruction of Major Sanitary Mains High Strength Fiberglass for New Systems No Impact to Users
15
Sanitary Sewer Improvements Pre-Project Sanitary Sewer Network
16
Sanitary Sewer Improvements Sanitary Sewer Replacements
17
Anticipated Project Schedule Fall 2014 - Construction Contract Award Winter 2014/2015 - Construction Begins Spring 2015 - Riverside Drive Closure 2016 - Riverside Drive Pavement Construction 2017 - Project Completed
18
Questions?