Herndon Metro Station: Cost Estimates for Town Requests August 6, 2014
2
Herndon Station North Side PavilionAugust 6, 20142 Herndon Metro Station TOWN OF HERNDON RESTON
3
Town requested at the Metro Town-Side Pavilion: Herndon Station North Side PavilionAugust 6, 20143 3. Decorative black handrail/fence both sides of sidewalk (approx. 1000’) – VDOT special standard 1. Imprinted concrete along retaining wall (approx. 400’) – VDOT special standard 2. Metro Sign at Herndon Parkway 4. Canopy for 30 bike racks 5. More durable sidewalk standard
4
Herndon Station North Side PavilionAugust 6, 20144 For Today’s Consideration Review MWAA Cost Estimates Consider Town Options Direct Staff
5
Herndon Station North Side PavilionAugust 6, 20145 Land to be acquired Permanent Easement to be acquired Temporary Easement Land to sold after construction Town-side entry pavilion Land Transactions for Town-Side Entry Pavilion
6
Town Easements to be Affected: trail, water and sewer Herndon Station North Side PavilionAugust 6, 20146 Approx. location existing trail and utility easement Town water and sewer lines & easements to be relocated
7
Herndon Station North Side PavilionAugust 6, 20147 Town Actions Associated with Town-Side Metro Facilities Planning participation since 2010 Letter Agreement Town-Fairfax County-MWAA 2013 Authorization of Relocated water-sewer-trail easements Consideration of Special Exception
8
Explanation of Cost Estimates August 6, 2014Herndon Station North Side Pavilion
9
August 6, 20149
10
Herndon Station North Side Pavilion10 Questions?