Board of County Commissioners June 10, 2014. CPA-AA-14-21 Duke Energy Florida for HCR Limestone Department of Planning and Development Geographic Resources.

Similar presentations


Presentation on theme: "Board of County Commissioners June 10, 2014. CPA-AA-14-21 Duke Energy Florida for HCR Limestone Department of Planning and Development Geographic Resources."— Presentation transcript:

1 Board of County Commissioners June 10, 2014

2 CPA-AA-14-21 Duke Energy Florida for HCR Limestone Department of Planning and Development Geographic Resources and Community Planning Division

3 Add AH000050

4 Request: Revise the Generalized Future Land Use Map Designation and the Land Use Atlas Map (Current Zoning) Designation of a ± 400.00 acre site: Existing: EXT, Extractive District on the Generalized Future Land Use Map of the Comprehensive Plan & EXT, Extractive District on the Land Use Atlas Map of the Land Development Code. Proposed: TCU, Transportation, Communication, Utilities District on the GFLUM & TCU, Transportation, Communication, Utilities District on the LUAM with a condition limiting the use to Power Generation Facilities as offered by the applicant Department of Planning and Development Geographic Resources and Community Planning Division

5 Add AH000049-GFLUM

6 Add AH000060-LUAM

7 2417. Transportation, Communication, Utilities

8

9 Staff Analysis Concurrency for Solid Waste, Sanitary Sewer, Potable Water, Drainage, Public Schools Compatibility with the surrounding area Consistency with the Comprehensive Plan Compliance with the Land Development Code Existing Site Conditions Review

10 Concurrency Solid Waste 645 pounds would be generated (4.3 lb per capita per day) Sufficient Capacity exists at the Citrus County Landfill Sanitary Sewer 11,250 gpd would be generated (75 gpd per person) Onsite Sanitary Sewer System will be installed Potable Water 18,750 gpd would be required (125 gpd per capita) Onsite Water Treatment System will be installed (No new well) Drainage Open Basin Design for the 25-year/24-hour storm event Public Schools Not applicable since residential uses are not allowed in TCU

11 Compatibility Adjacent Land Uses include: Mining Uses both active and future permitted mining areas Existing power generation facilities No Compatibility issues are evident

12 Consistency with Comprehensive Plan Applicant sites 11 Goals, 27 Objectives, and 66 Policies from these elements that support the application: Ch 3 – Conservation Ch 4 – Coastal Lakes and River Management Ch 5 – Infrastructure Solid Waste, Sanitary Sewer, Potable Water, Drainage Ch 9 – Utility Ch 10 – Future Land Use Ch 11 – Intergovernmental Coordination Ch 12 – Capital Improvements Ch 15 – Economic Development

13 Existing Site Conditions The site contains varied types of natural environment: Dense native woodlands Planted pines Re-vegetated areas where planted pines have been harvested Wetland areas Bald Eagle’s Nest

14

15

16

17

18 Woodlands

19

20

21

22

23

24

25

26 Recommendations: STAFF: APPROVAL WITH A CONDITION ON THE ATLAS AMENDMENT LIMITING THE USE TO POWER GENERATION FACILITIES PDC: APPROVAL WITH A CONDITION ON THE ATLAS AMENDMENT LIMITING THE USE TO POWER GENERATION FACILITIES Department of Planning and Development Geographic Resources and Community Planning Division

27 Add AH000050


Download ppt "Board of County Commissioners June 10, 2014. CPA-AA-14-21 Duke Energy Florida for HCR Limestone Department of Planning and Development Geographic Resources."