Presentation is loading. Please wait.

Presentation is loading. Please wait.

Preliminary Design of Galvez Estates Subdivision.

Similar presentations


Presentation on theme: "Preliminary Design of Galvez Estates Subdivision."— Presentation transcript:

1

2 Preliminary Design of Galvez Estates Subdivision

3 Summary of Topics Introduction General Site Information Sanitary Sewer Design Design of Subdivision Hydrologic Analysis Traffic Impact References

4 General Site Location LA 42

5 General Site Information Development Site: Tracts A & B Development Size: 47.9 Acres Lot Size: 70’x150’ Minimum Number of Lots: 100 Land Cost: $30,000/acre Construction Cost: $450/linear foot of street Profit Goal: >$2.5 million

6 Sanitary-Sewer Design Pipe Size Design Based on:  Peak Flowrate  Manning’s with PVC Pipes Flowing Half-Full Q peak = 1.69 cfs Diameter = 1.7” ~ 2” Per EBR: Minimum Pipe size = 8”

7 Sanitary-Sewer Design Velocity Requirements  Minimum Velocity = 2 fps  Maximum Velocity = 10 fps Manning’s with PVC Pipes Flowing Half-Full V = 2.4 fps

8 Sanitary-Sewer Design

9 Design of Subdivision

10 Lot size of 70’x 150’ Lot frontage along Curved Right of Ways held to 70’ at building line Building Lines held to 25’ 122 lots Curb and gutter with subsurface drainage

11 Design of Subdivision Road Design  12 feet utility servitude outside 50 ft right-of-way  Surfaced with 3”asphalt cement over 12” soil cement sub base  Road designed above Base Flood Elevation of 18’  Minimum road slope of 0.4%

12 Road Cross Section

13 Preliminary Earthwork CUTFILL POND96,500 C.Y.------- ROADWAYS8,700 C.Y.1,900 C.Y. LOTPADS--------T.B.D.

14 Drainage Design Site Conditions  Topography  Soil Types  Flood Zone Pre-Development Drainage Post-Development Drainage Fill Mitigation Design Storm

15 Soil Types Calhoun Silt Loam  81.1% of Site Deerford-Verdun Complex  17.9% of Site Olivier Silt Loam  1% of Site Predominately Hydrologic Group D

16 FEMA F.I.R.M. FIRM Panel# 2205C0035E Flood Zones “AE” & “X” BFE=18.0’

17 Pre-Development

18 Catchment Area 1Discharge Rational Method  Weighted Runoff Coefficient, C = 0.32  Intensity, I = 4.0 in/hr (EBR Drainage Manual)  Area, A = 47.2 Ac (Includes 7 Ac of adjacent land) Pre Development Discharge, Q = 60.4

19 Post Development

20 Fill Mitigation Not an Issue Majority of Site is above Base Flood Elevation  1,100 C.Y. of Storage Loss due to Fill Pond Normal Pool Below B.F.E.  B.F.E.=18.0’  Normal Pool = 13.75’  Potential for >30,000 C.Y. of Storage Offsets Loss due to Fill

21 Design Storm 10 yr, 24 hr Event Total Rainfall = 8.5” (EBR Drainage Manual) Modeled in HydroCAD  SCS - Type III Event

22 Post-Development Hydrograph

23 Current Site Conditions Route: LA0042 milepoint: 19.61 station: 205510 Year – ADT 2007 – 12566 Route: LA0933 milepoint: 0.82 station: 205530 Year – ADT 2007 - 5684

24 Traffic Impact Analysis (Per Institute of Transportation Engineers’ Trip Generation Model)

25 Design Vehicle S-Bus36 Minimum Design Turning Radius = 38.9’ Centerline Turning Radius = 34.9’ Minimum Inside Radius = 23.8’

26 Galvez Boulevard @ La 932 La 932 Galvez Boulevard

27 Permits Lousiana DOTD  Right Of Way Permits  Highway Access, Utilities, Vegetation Department of Health And Hospitals  Sanitary Sewer, Onsite Treatment Ascension Parish  Subdivision Permit

28 References East Baton Rouge Parish Unified Development Code Trip Generation – Institute of Transportation Engineers - 6 th Edition Google Maps www.DOTD.Lousiana.gov AASHTO Guide for Design of Pavement Structures


Download ppt "Preliminary Design of Galvez Estates Subdivision."

Similar presentations


Ads by Google