November 14, 2014 Hobby International & IAH Terminal Redevelopment Program Update Jarrett Simmons, Assistant Aviation Director – Planning Houston Airport System
2
2 2 Hobby International Terminal Program
3
New Concourse New Parking Garage Terminal Expansion New Satellite Central Plant Entry Roadway Modifications
4
Hobby International Terminal Program Roadway Signage
5
Hobby International Terminal Program Airport Boulevard Landscaping
6
Hobby International Terminal Program New Concourse Construction
8
Hobby International Terminal Program New Garage Construction
10
10 Intercontinental Airport Terminal Redevelopment Program (ITRP)
11
11 International traffic is booming in Houston Reflecting the strength of the local economy, airlines continue to add new routes—most outside of IAH’s historically strong Latin American market. 2007: Dubai (Emirates) 2008: Singapore via Moscow (Singapore) 2009: Rio de Janeiro (United); Doha (Qatar) 2010: Monterrey (VivaAerobus) 2011: Lagos (United) 2012: A380 to Frankfurt (Lufthansa) 2013: Third daily London (United); Istanbul (Turkish); Beijing (Air China) 2014: Second daily Tokyo, Munich, and Punta Cana (United); Seoul (Korean); Stavanger (SAS); Guadalajara and Cancun (VivaAerobus); Santiago de Chile (United); Monterrey (Aeromexico and Interjet); A380 to Dubai (Emirates) 2015: Taipei (EVA)
12
12 More international gates are needed to meet demand With only 6 widebody gates, Terminal D cannot accommodate new long-haul services at peak times. Terminal D 12 gates; foreign flags Terminal E 23 gates UA int’l Central FIS ~4,000 pax per hour Terminal C UA domestic Terminal B UA Express Terminal A Other domestic
13
13 Emirates Airbus 380 – Arrives at IAH 12/3/14
14
14 Second A380 gate under construction at IAH (11/13/14)
15
15 Emirates A380 First Class Fare
16
16 Intercontinental Airport Terminal Redevelopment Program (ITRP) ITRP is in partnership between HAS and United Airlines United’s ScopeHAS’s Scope
17
Utility Site & Utility Corridor Package New electrical receiving station, domestic water tanks & utility tunnel New Hardstand
18
Future Hardstand 8 – 747/777 Positions
19
ITRP PMO Building
20
The Leland International Terminal is the best solution Terminal Package - 801,530 S.F. 15 international widebody gates (including 4 A380) Apron Package – 1,386,000 S.F. (Pavement, drainage, hydrant fueling, etc.) Mickey Leland International Terminal (Terminal D)
21
New North Terminal Roadway Package (Includes New dedicated lanes for Terminals C, D & E)
22
Federal Inspection Services Package (FIS) Package FIS Expansion, Security Checkpoint Consolidation & New Custom & Border Protection (CBP) & Public Parking Garage
23
Upcoming ITRP Procurement Dates PackageDate Industry DayJan. 2015 Enabling Utility Design/Build1 st Qtr 2015 Hardstand Design/Build1 st Qtr 2015 PMO Building Design/Build1 st Qtr 2015 Terminal Design2 nd Qtr 2015
24
For more information on the IAH Terminal Redevelopment Program Please visit: www.fly2houston.com/TerminalD Communications Regarding Executive Program Management (EMP) and Program Support Services (PSS) RFQ’s must Be Received In Writing And Directed Only To: Mr. Andre’ Morrow Senior Procurement Specialist Houston Airport System Supply Chain Management andre.morrow@houstontx.gov For information on MWDBE certification please contact: has.obo@houstontx.gov
25
Other upcoming FY15/FY16 opportunities Project #StatusProjectCost Mil 721DIAH Cell Phone Lot (JFK Will Clayton)$11.8 736DBHAS Admin Building ExpansionTBD 686DIAH Storm water Pollution Control System$16.0 565CIAH Landside Roadway Repairs$13.8 634CIAH Terminal A Vault Replacement$11.6 651CIAH Taxiway WA/WB$33.6 675DIAH NA Taxiway$34.0 689 A / BDIAH Term A & C OTA Baggage Handling System$35.0 / $2.0 699DIAH Sanitary Sewer Improvements$9.0 711CIAH EcoPark2$11.8 712CIAH Terminal C Light Pole Replacement$5.0 740DIAH Vehicle Maintenance Facility$4.4 746CIAH Old Control Tower Demolition$2.0 761DBIAH Parking Locator Guidance System$15.0 545 BCHOU Consolidated Maintenance Center Complex$6.3 690CHOU TSA Checked Baggage EDS Recap$11.2 TBDDHOU RTR Cable Relocation$0.4 TOTAL$222.9
26
26 Questions