1 Denver International Airport South Terminal Project and Taxi Operation Update

2 South Terminal Redevelopment Project

3 Current Phase of Project

4 Excavation of South Grounds

5 Removal of Terminal Roadway Bridges

6 Taxi Driver Dwell Time Project Goals: Upgrade the AVI System Software Allow Cab Operators to Load / Manage Their Daily Dispatch Lists Monitor and Report About Drivers’ Dwell / Duty Time

7 Entrance to the Holding Lot

8 Installation of Proximity Card Readers

9 Taxi Dispatch Queue

10 Revenue Collection Gate

11 Dispatcher’s Window

12 Dwell Time and AVI Tag Read Functions

13 Project challenges Airport IT / Software vendor interface Timeline control Hardware and installation Communication with taxi operators / PUC Training for staff and operators

14 Thank You! Questions?