Denver International Airport South Terminal Project and Taxi Operation Update
2
South Terminal Redevelopment Project
3
Current Phase of Project
4
Excavation of South Grounds
5
Removal of Terminal Roadway Bridges
6
Taxi Driver Dwell Time Project Goals: Upgrade the AVI System Software Allow Cab Operators to Load / Manage Their Daily Dispatch Lists Monitor and Report About Drivers’ Dwell / Duty Time
7
Entrance to the Holding Lot
8
Installation of Proximity Card Readers
9
Taxi Dispatch Queue
10
Revenue Collection Gate
11
Dispatcher’s Window
12
Dwell Time and AVI Tag Read Functions
13
Project challenges Airport IT / Software vendor interface Timeline control Hardware and installation Communication with taxi operators / PUC Training for staff and operators
14
Thank You! Questions?