Presentation is loading. Please wait.

Presentation is loading. Please wait.

SeeCrane system August 2010 Version 2 1.Company Overview Hi-Tech Solutions 2.

Similar presentations


Presentation on theme: "SeeCrane system August 2010 Version 2 1.Company Overview Hi-Tech Solutions 2."— Presentation transcript:

1

2 SeeCrane system August 2010 Version 2

3 1.Company Overview Hi-Tech Solutions 2

4  Established 1992  Leading developer and supplier of Optical Character Recognition (OCR)  LPR and CCR applications in security, automation and management for ports and traffic markets.  Successful deployment in over 30 countries  Established partnerships with top-tier global companies 3

5 Proven Supplier of OCR Solutions Worldwide 4

6 Comprehensive Implementation Capabilities  Prime contractor experience  MTC, USA  Rotterdam, Netherlands  Large scale project experience  Vendor supply  integration  Database management capability  Back office capabilities in real time monitoring of cameras 5

7 Technology Offerings CCR Container Code Recognition LPR License Plate Recognition OCR OCR Systems Capture Images, Identify Container and Plate Numbers 6

8 Proven State of the Art LPR Solutions  Low and High-Speed LPR  Up to 200 km/hour  Flexible & adaptable  Surveillance, access control, security, traffic management, toll roads, parking applications 7

9 Broad LPR Deployment Base  Sample Installations:  Electronic Toll Highways (South Bay Hwy, CA)  Athens Summer Olympic Games (SAIC)  Airports (Security, Parking)  Government Facilities  Border Crossing Systems  Traffic Monitoring 8

10 CCR Solutions  Truck Gate OCR (plate, container, chassis, DI, IMO labels)  Pedestal LPR units, matched with Portals (hundreds of lanes)  Ship-to-Shore Crane OCR (Over 70 systems installed)  Rail OCR (9 systems installed)  Other systems under development BENT Terminal Port of Oakland STS Terminal Port of Seattle Trapac Terminals Port of L.A. 9

11 Key Customers  US DHS, TSA - ACTA (Alameda Corridor Transportation Authority)  US DoE (Department of Energy) – LPR/CCR in RPM Systems  Oak Ridge National Labs (CA, USA)  Ben Gurion Airport (Tel-Aviv, Israel)  IBM S 3 (NY, USA)  MTC (Marine Terminal Corp) - US West Coast  Maersk/APM Terminals (CA, USA)  ECT, EuroMAX (Port of Rotterdam, Netherlands)  Port of Southampton, UK  MGM (Ports of Marseille & Foss, France)  Busan New Port (Korea)  South Bay Highway SR125 (San Diego, CA USA) 10

12 2. CCR – Sample Installations 11

13 Second Line for Defense for US Department of Energy Busan Korea – 4 lanes 12

14 Second Line for Defense for US Department of Energy Southampton, UK – 3 lanes 13

15 Kramer, Rotterdam 2 phases – 6+8 lanes 14

16 Second Line for Defense for US Department of Energy Algeciras, Spain – 2 lanes 15

17 Euromax, Rotterdam Euromax– 4 lanes 16

18 PSA, Belgium Antwerpen – 5 x 2 x 2 Seegate2 systems (3 x 2 done) 17

19 MTC – 7 terminals – 70 cranes ZPMC in WBCT B100 18

20 PCT Tacoma 7 Cranes 19

21 EMX Rotterdam 1 pilot Crane (in progress) 20

22 3. SeeCrane Architecture 21

23 Camera positions on sill beam 22 Cameras

24 Camera positions on sill beam 23 Basic system: Array of 6 cameras installed on crane sill beams; 3 on each side

25 Camera configuration (front) 24

26 Capture & Zoom 25 When the container enters the green zone, the camera and grabber system is initialized

27 Image capture 26 The cameras will grab images as the container passes their view, at pickup and set-down.

28 Dataflow Crane PLC MCP Terminal Operating System OCR SeeCrane 1. Crane PLC Provides Position Data to MCP 2. MCP Triggers Select Cameras3. Cameras return multiple images4. MCP Send Images to OCR Module5. OCR Returns Container ID to MCP 6. Container ID, time and location sent to TOS

29 4. Results 28

30 GUI – main display

31 Outputs Recognition results Image files (jpg) Video clips

32 Performance Design Front reach: 95% of readable containers, 7/24 operation Back reach: 75-85% (>95% with EBR option) Actual Performance CONTAINERS: 97-99% of readable containers, with matching Scratched on both sides: about 2-3% of total events

33 5. Hardware 34

34 35 Camera enclosure

35 36 TWO CONTROL BOXES ARE PROVIDED, QUAYSIDE & LANDSIDE SeeCrane Control Boxes

36 2002-12-12 Equipment room

37 6. Back Reach 38

38 Standard Back Reach Up to 3 cameras on the back reach side sill beam – captures a single view for each container

39 Enhanced Back Reach Add 2 PTZ cameras on each side of the crane Captures 3 views of the container (side, back, front)

40 7. Middleware 41

41 Hierarchy of computers 42

42 XML interface 43

43 XML fields (lane PC) 44

44 SeeTerminal GUI 45

45 Station status 46

46 8. Utilities 47

47 Crane viewer 48

48 SeeCleaner 49

49 SeeService 50

50 SeeMonitor – status lights 51

51 SeeMonitor – Graphs 52

52 SeeMonitor 53

53 Mail notification 54

54 Last Slide… Thank you 55


Download ppt "SeeCrane system August 2010 Version 2 1.Company Overview Hi-Tech Solutions 2."

Similar presentations


Ads by Google