Blue print for throughput enhancement on HDN B.V.L.Narayana SPTM/ RSC/ BRC
2
Critical issues and redressal Constraints CAPACITY CONSTRAINTS ON HDN ROUTES Terminal constraints Overcome by Investments in Strategic capacity expansions
3
High density network Consists of Seven routes Six feeder routes Carries 76% of freight GMT 71% of passenger and freight GMT Accounts for 28% of route KMs
4
HDN –routes and feeders
5
ISSUES CONSIDERED GROWTH PATTERNS OF MAJOR COMMODITIES FOR ALL ROUTES EXCEPT NDLS-HWH and NDLS-BB STEEL COAL CONTAINERS IRON ORE PORT CONNECTIVITY LRDSS PROJECTIONS FROM 2005-06
12
Eleventh plan targets
13
Methodology Collate all line capacity statements for all HDN routes Project capacity utilization till 2011-12 Identify critical sections Validated by projections from LRDSS Review with zonal railways Estimate level of investments
14
Recommendations 124 works 14185 crores investments Over and above DFC projects Investment needs for 25t Axle load separately done
16
LRDSS an objective tool for planning and prioritizing capacity enhancement projects based on traffic projections over the next two decades. Started in 1994 Strategic tool for long term investment planning
17
LRDSS The system consists of a comprehensive set of modules which cover different aspects of the investment analysis viz:- 1) Facility Performance Module 2) Market Analysis Module 3) Traffic Forecasting Module 4) Traffic Assignment Module 5) Benefit Cost Analysis Module 6) Terminal Analysis Module 7) Multi-modal Corridor Analysis Module
18
LRDSS Inputs required Production and consumption forecasts From planning commission Ministries Traffic surveys Market surveys for customer sensitivity Cost data Field Level Data To Simulate Train Running On a Section
21