Download presentation
Presentation is loading. Please wait.
1
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
2
Equipment Available from LAYCO
BLENDERS VOLUMETRIC BLEND SYSTEM TAPERED AUGER VERTICAL SINGLE-UNIT BLENDER SUPER FLOW ROTARY BLEND SYSTEM HORIZONTAL/VERTICAL-AUGER SELF-CONTAINED BLENDER OPEN-TOP BLENDERS TOWER BLEND SYSTEM CONVEYORS CHAIN PADDLE CONVEYORS PORTABLE CONVEYORS OVERHEAD CONVEYORS FIELD LOADERS BUCKET ELEVATOR LEGS
3
TOWER BLEND SYSTEMS
4
TOWER BLEND SYSTEM SPECIFICATIONS
FEATURES: Layco Tapered Auger Unit Blender Nine bins Weigh Hopper with Scale Custom designed to fit blend & capacity requirements up to 150 tons per hour and 2-15 bins Tubular modular Design
5
Units Come Fully Welded and Painted
TOWER BLEND SYSTEM Units Come Fully Welded and Painted
6
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM
Foundation Drawings Furnished by Yargus Manufacturing
7
All tubular Construction, Bolt Together Frames
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM All tubular Construction, Bolt Together Frames
8
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM :
Tanks are unloaded off of trailer and bolted together on location.
9
ON-SITE SET UP OF SYSTEM Bolt together Sections
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Bolt together Sections
10
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM
Complete 200 Tank can be lifted in one section.
11
ON-SITE SET UP OF SYSTEM
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM The Cone Sections are all bolt together and pre-welded at Yargus Manufacturing.
12
ON-SITE SET UP OF SYSTEM Saves labor and Safer Installation.
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Saves labor and Safer Installation.
13
ON-SITE SET UP OF SYSTEM
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM 200 Ton Tank being lifted.
14
ON-SITE SET UP OF SYSTEM
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM
15
ON-SITE SET UP OF SYSTEM Placement of 200 Ton Bin in Saddle
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Placement of 200 Ton Bin in Saddle
16
All Tower Support Structure is made of tubular steel
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM All Tower Support Structure is made of tubular steel
17
ON-SITE SET UP OF SYSTEM
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Based on building height, Cladding will enclose the Tower and also has rain gutter
18
ON-SITE SET UP OF SYSTEM
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Pre-fitted Distributor with Downspout
19
ON-SITE SET UP OF SYSTEM Crane raising Distributor
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Crane raising Distributor
20
ON-SITE SET UP OF SYSTEM Bucket Elevator Leg and support
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Bucket Elevator Leg and support
21
ON-SITE SET UP OF SYSTEM Bucket Elevator Leg with Support
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Bucket Elevator Leg with Support
22
ON-SITE SET UP OF SYSTEM
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Final Assembly
23
ON-SITE SET UP OF SYSTEM
TOWER BLEND SYSTEM ON-SITE SET UP OF SYSTEM Final Assembly
24
Cladding of Tower and Roofline
TOWER BLEND SYSTEM FINAL PRODUCT Cladding of Tower and Roofline
25
Cladding of Tower and roofline
TOWER BLEND SYSTEM FINAL PRODUCT Cladding of Tower and roofline
26
Cladding of Tower and Roofline
TOWER BLEND SYSTEM FINAL PRODUCT Cladding of Tower and Roofline
27
Cladding of Tower and Roofline
TOWER BLEND SYSTEM FINAL PRODUCT Cladding of Tower and Roofline
28
TOWER BLEND SYSTEM FINAL PRODUCT
29
Access Ladder from Base of Tower Blend System
TOWER COMPONENTS Access Ladder from Base of Tower Blend System
30
Base of Blenders with Grating
TOWER BLEND SYSTEM TOWER COMPONENTS Base of Blenders with Grating
31
TOWER BLEND SYSTEM TOWER COMPONENTS Tubular Construction
32
Cladding and wood bolted to tubular frame
TOWER BLEND SYSTEM TOWER COMPONENTS Cladding and wood bolted to tubular frame
33
TOWER BLEND SYSTEM TOWER COMPONENTS Air gate off of Blender
34
Stainless Steel Top of Blender with Tapered Gearbox
TOWER BLEND SYSTEM TOWER COMPONENTS Stainless Steel Top of Blender with Tapered Gearbox
35
Two way gate going from weigh hoppers loading two blenders
TOWER BLEND SYSTEM TOWER COMPONENTS Two way gate going from weigh hoppers loading two blenders
36
Scale Mount with Mechanical Scale
TOWER BLEND SYSTEM TOWER COMPONENTS Scale Mount with Mechanical Scale
37
TOWER BLEND SYSTEM TOWER COMPONENTS N TEP Scale Design
38
Out of Main Bin Gates to the Top of the Weigh Hopper
TOWER BLEND SYSTEM TOWER COMPONENTS Out of Main Bin Gates to the Top of the Weigh Hopper
39
14 inch Stainless Steel Salem Gates out of Bins to Weigh Hopper
TOWER BLEND SYSTEM TOWER COMPONENTS 14 inch Stainless Steel Salem Gates out of Bins to Weigh Hopper
40
Access door from Tower to Bucket Elevator Leg
TOWER BLEND SYSTEM TOWER COMPONENTS Access door from Tower to Bucket Elevator Leg
41
Diamond Tread Plate Sloped Roof, Stainless Steel Access Doors to Bins
TOWER BLEND SYSTEM TOWER COMPONENTS Diamond Tread Plate Sloped Roof, Stainless Steel Access Doors to Bins
42
TOWER BLEND SYSTEM TOWER COMPONENTS
Tubular Handrail around complete tower, Stainless Steel Flange Rings welded to Bin Cover
43
Stainless Steel Downspout Accessories
TOWER BLEND SYSTEM TOWER COMPONENTS Stainless Steel Downspout Accessories
44
Easy Access Control Panel
TOWER BLEND SYSTEM TOWER COMPONENTS Easy Access Control Panel
45
TAPERED AUGER VERTICAL SINGLE-UNIT BLENDER
46
TAPERED AUGER VERTICAL SINGLE-UNIT BLENDER SPECIFICATIONS
FEATURES: Flat dump side for space efficiency Dome Top or Flat Top Large loader hopper & lower dump height make loading faster & more efficient Lower center of gravity means better stability & safer operation
47
CHAIN PADDLE CONVEYORS
48
CHAIN PADDLE CONVEYOR SPECIFICATIONS
FEATURES: Easily moves bulk fertilizer, sand, salt, or any free flowing material Loads well in steep angle areas Environmentally sound, easy to service and maintain 90, 120, 150, 180, 200, 240, 300 & 400 tons-per-hour capacity Features open barrel chain Totally bolted construction
49
OVERHEAD CONVEYORS CHAIN PADDLE
50
CHAIN PADDLE OVERHEAD CONVEYORS FEATURES: 2.6” pitch open barrel chain
5/8” thick UHMW paddle 9 tooth drive sprocket 9 tooth take up sprocket 3” diameter UHMW rollers on 30” spacing 3’ long stainless steel door opening Clean out door at drive end
51
BUCKET ELEVATOR LEGS
52
BUCKET ELEVATOR LEG SPECIFICATION
FEATURES: Available in 20 to 160 foot discharge height 90, 120, 150, 200, 250, 300 and 400, 500, 600, 800 ton capacities Anti-back-legging plate on discharge opening Vulcanized crowned drive pulley Diamond break on leg housing for added strength
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.