Download presentation
Presentation is loading. Please wait.
Published byZackary Porte Modified over 9 years ago
1
Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012
2
Master Data for SCM (1) Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) FAll, 2012
3
Master Data for SCM (1) Master Data in Demand Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012
4
Master Data Overview Like in ERP, master data plays an important role in APO and control many processes. Some master data objects in APO have analogies in ERP like product (Material in ERP), and most of these are transferred from ERP. Others have to be maintained in APO. Most organisational entities from ERP are not needed for APO, which is only concerned with logistics and not accounting and costing; so organizational entities such as company codes, or cost centers have no significance in APO.
5
Master Data Overview Most master data such as materials are transferred from the ERP to APO. Locations is the main organisational entity in APO. In addition, different planners are created for each location and each of the following modules (DP, SNP, PP/DS, and TP/VS). The planners are assigned to the material master (i.e., product in APO); thus they are not transferred from ERP.
6
Master Data Objects in SAP APO and SAP ERP (review)
7
Location Types in SAP APO APO uses only one object for a location; it may have different location types. APO uses only the location name as the key, not the location type. Additional location information such as calendars, storage and handling resources and planning relevant categories (i.e., stock categories for SNP and receipt and issues for deployment) are defined in APO. Make sure no code crashes due to plants, suppliers or customers with the same names.
8
Location Types in SAP APO
9
DP Function in SCM (review) THEORY AND PRACTICE OF ADVANCED PLANNER AND OPTIMIZER IN SUPPLY CHAIN DOMAIN by Sam Bansal
10
Common Time Horizons for DP and Sales in SCM (review)
11
Level of Detail and Time Horizon of DP in APO Modules (review)
12
DP and Sales Processes in APO Modules (review)
13
DP Module in APO System Structure and Integration with ERP (review)
14
Overview Master Data and Application in DP and Sales (review) Master Data for Demand Planning: CVC, Product, Interchangeability group. Note: CVC can be generated from historical data that is transferred from ERP. If no historical data is available, e.g. for new products, CVC can be maintained in APO as well. Master data for Sales: Location, Product, Rules, and Interchangeability group.
15
Overview Master Data and Application in DP and Sales
16
Process for Demand Planning
17
Demand Planning Process The result of the demand planning process is the establishment of independent requirements which will trigger the planning activities of distribution, production and procurement planning. The sales forecast is consolidated and checked regarding plausibility, probably checked against a statistical forecast and corrected according to the experience of the planner before releasing it for the subsequent planning steps. The monitoring of the forecast accuracy and a feasibility check against the planning constraints (e.g. capacity) are further common process steps
18
Planning Levels and Consistent Planning The most elementary questions in DP are: on which levels (product, product group, …) to plan? in which granularity of time (weeks, months) to plan? which data is required? In APO, planning levels are represented by characteristics (CVC), the granularity of timer corresponds to the time (i.e., time bucket), and the data (linked to “key figures” such as revenue and sold quantity). Both characteristics and key figures are technically represented by “info objects”.
19
Data Structure for Demand Planning
20
Planning Levels and Consistent Planning Planning shall take place on the levels of sales organization, location, product and product group. Each product belongs to only one product group Each sales organization is linked to only one location ( Key figures are sales forecast and demand plan.
21
Planning on Aggregated Level
22
Automatic Disaggregation
23
Demand Planning Structure Overview
24
The display of the data and the planning is performed in Planning book. A planning book is always linked to a planning area which contains the key figures. For the defined characteristic value combinations (CVC) time series are created for each key figure of the planning area. The time series contain the actual data, so that the planning book serves to display the time series of the planning area. The planning area itself is connected to a basic planning object structure, where the relevant characteristics are defined. Historical data is stored in an info cube (which contains both characteristics and key figures).
25
Planning Object Structure and Planning Area
26
It is recommended not to change planning object structure and planning area
27
Time Buckets In DP there are two kinds of time bucket profiles: the storage bucket profile and the planning bucket profile. The data of planning area is always stored in the storage bucket profile, while the planning bucket profile is used to display the data in the planning book. In the planning bucket profile only those period types (month, week, …) can be used that are also defined in the storage bucket profile. If the time buckets do not match as with months and weeks, the periods are divided as shown below, in Figure 4.7.
28
Data Storage Bucket Profiles
29
Active Characteristic Value Combinations (CVC)
30
Entities for Life Cycle Modelling
31
Settings for Life Cycle Planning Example
32
Promotion
33
CVC for the Use of DP-BOMs
34
Release of the Demand Plan
35
Process for Forecast after Constraints
36
Structure of the Transfer to SAP ERP
37
Master Data for SCM (1) Master Data in Fulfillment Process EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012
38
Process for Order Fulfillment
39
Order Fulfillment Overview Order fulfillment contains the processes related to the customer from order taking, availability check and confirmation to the shipment to the customer. The sales order entry is performed in ERP either manually or via EDI, but ATP check is carried out in APO during the sales order entry. The transportation planning is performed in APO based on the deliveries and sends shipments back to ERP. There is an alternative way to perform transaction planning first based on sales orders and trigger the delivery creation from APO, but this has disadvantages in the flexibility if ATO check turns out to be unsuccessful.
40
Order Life Cycle
41
Tasks during Sales Order Entry
42
Categories and Attributes of a Supply Chain (review) - Reproduced from Fleischmann B., Meyr H, Hierarchy and Advanced Planning Systems, Handbooks in OR and MS, Chapter 9, Elsevier, 2003, pp 457-523
43
Business Events
44
Default Assignment of Strategy to Requirement Class
45
Location Substitution with /Without Stock Requisition
46
Transaction for Condition Technique
47
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes SAP Implementation EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012 Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes SAP Implementation EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012
48
Master Data, Model, and Version
49
SAP ERP Transactions for Independent Demand Configuration
50
Exercises: 1. Create plant location 2. Create distribution center locations 3. Create vendor locations 4. Create customer locations 5. Create finished product master 6. Create raw materials master 7. Create resources master 8. Assign plant, DC, vendors, customers, finished product, raw materials, and resources to active model
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.