NuMI Target Pile Fan Repair Michael Andrews 3/15/10
2
Broken Seal
3
Replace Fan Motor & Wheel
4
Install & Remove Scaffold
5
Remove Dehumidification Duct Work
6
Install Crane Electronics
7
Remove Electrical Infrastructure
8
Remove Poly Sheet & Place 2 M Blocks
9
Remove Instrumentation Pneumatic Controls for Chilled Water Valves Air Flow, Pressure & Humidity Sensors
10
Cut Out Ductwork
11
Unbolt Flange
12
Unbolt Feet
13
Jack Up Housing Place on Dollies & Slide Rails Move 20 Inches to East
14
Unbolt & Remove Cone
15
Remove Shaft Seal
16
Loosen Set Screws & Keyway
17
Remove Wheel with Crane
18
Install Inspection Port for Balancing
19
Replace Vibration Sensors
20
NuMI Target Hall
21
Access West side of Work Cell
22
North end of Target Hall
23
Status & Schedule All equipment & materials requisitions are in place. Critical path items are delivery of the motor & wheel (4-6 weeks) Work completed by T&M subcontractors (Arlington Electric, Prism Mechanical, Scaffolding) Instrumentation & Crane support from Heip Le & Crew Engineering & Task Manager support from C. Crowley, J. Ranson, R. White Fan balancing completed by Chicago Blower Mini-Review for job plan by L. Hammond, K. Anderson, T. Busch Hazard Analysis and ALARA Plan are in development Run Until is Breaks – 2 Weeks (10 hrs days Seven Days a Week) Repair During the Summer 2010 Shutdown – 3 Weeks