Sector New Orleans NEW FINAL HURRICANE RNA RULE Regulated Navigation Area
2
Sector New Orleans Process for the 2014 season Location Definitions Special Requirement for Facilities Mooring Requirements Tow Boat Requirements Enforcement OBJECTIVES Regulated Navigation Area
3
Sector New Orleans RNA East Where
4
Sector New Orleans RNA West UNCLASSIFIED FOUO Where
5
Sector New Orleans Facility: Floating Vessel: Definitions 33 CFR 165.838.b Who
6
Sector New Orleans Annual Hurricane Operations Plan Facility & Vessel owners should utilize 33 CFR 165.803, UFC 4-159 and ASCE 7 in the development of the Annual Hurricane Operations Plan. What
7
Sector New Orleans Certification by a professional engineer that the mooring arrangement are able to withstand winds of up to 140 mph, a surge water level of 11 ft, a current of 4 mph and wave height of 3 ft on the East side. What: Mooring Criteria East
8
Sector New Orleans Certification by a professional engineer that the mooring arrangement are able to withstand winds of up to 140 mph, a surge water level of 8 ft, a current of 4 mph and wave height of 2.5 ft on the West side. What: Mooring Criteria West
9
Sector New Orleans Each facility consisting of 8 or more vessels that are not under their own power must be attended by at least one radar equipped tow boat for every 50 vessels. Tow Boat Requirements What: Facility Towboat
10
Sector New Orleans No less than 800 horsepower Facility Towboat
11
Sector New Orleans Within 500 yards of the vessel. Facility Towboat
12
Sector New Orleans When: Vessel
13
Sector New Orleans Port Assessment Teams (PAT) How we do it West Closure Complex Lake Borgne Surge Barrier Sector Gate
14
Sector New Orleans Partnerships USACE Levee Protection Authorities How we do it
15
Sector New Orleans Port Coordination Team: This is where the rubber meets the road. How we do it
16
Sector New Orleans ENFORCEMENT When
17
Sector New Orleans When
18
Sector New Orleans Post Storm Follow Gulf Coast Inland Waterways Joint Hurricane Response Protocol – Waterway Assessment Team Convene a PCT call – waterway restoration How we do it
19
Sector New Orleans QUESTIONS?