LSC - 28 February 2014 - M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: 1346282 v.1.

Similar presentations


Presentation on theme: "LSC - 28 February 2014 - M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: 1346282 v.1."— Presentation transcript:

1 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: 1346282 v.1

2 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 2 R2E LHC cold compressors Project Overview Actual status Next Steps A special THANKS to all the people concerned: ICL, R2E, RWG, EN/STI, EN/EL, EN/CV, TE/CRG…..

3 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 3 Last 09 April 2013 TE/TM meeting :

4 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 4 QURC R2E project overview: P4 high priority, to be done during LS1. ICL  positioning validation P4 equipment inventory, very short time! (https://edms.cern.ch/comment/1323557) ECR (edms1346280) driven by cryogenic but all group involved R2E/P4 Planning (w.r.t LS1 planning) EN/EL (DIC : 350 cables) Special cable magnet bearing assembly (https://edms.cern.ch/comment/1342848) Magnet Bearing electronics MBC170 (prototype validated, ordered, production delivery March 2014) RadWG (new w.r.t TETM of april’13)  valve positioner & I/O cards (https://edms.cern.ch/document/1340848/1)https://edms.cern.ch/document/1340848/1 (ordered, in production delivery beginning April 2014) Cryo RF relocation (development, construction & installation May/June) AMB special cable FINAL length = 45 meters

5 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 5 Cryo cabinet relocation (Cable length 45m) [UX45 – level 2] QURC [8 cabinet QURC (AMB, Drive, local PLC & 45 SIPART positioner ] [US45 - level 1] QUI[1 cabinet (PROFIBUS & 20 SIPART positioner)] [UX45 – level 1] QURC a-b[2 cabinet (PLC, PROFIBUS)] [UX45 – level 0] Cryo RF[4 cabinet (PROFIBUS & 20 SIPART positioner)] TOTAL 15 cabinets to be redesign and relocated in UL44/46. R2E P4 relocation to be done in LS1

6 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 6 20132014 Preparation (cables & cabinets) ECR document, Integration activities EN/EL QURC QUIRF 01 0203040506 S34 CoolDown 07 S45 CoolDown 0809 CRYO maintenanceCRYO OP Re-commissioning New MECOS AMB@P4 AMB final validation 20K Stand alone 50-60% torque R2E/P4 work PLANNING Intense co-activities period!!! Main tasks to be done: Preparation (cables & cabinets) until end of February EN/EL cabling campaign 01 March – 30 June Installation new magnetic bearing electronic mid-April final validation in May/June

7 EN Point 4 R2E project Schedule for LS17 Maria Barberan courtesy

8 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 8 Project organization (main tasks) Project coordination M. Pezzetti (TE-CRG) Dep.: B. Ivens (TE-CRG) R2E Project and coordination / planning M. Brugger (EN/STI) / AL Perrot (EN-MEF) LS1 scheduling M. Barberan Marin (EN-MEF) Technical coordinator B. Ivens (TE-CRG) EN/EL cabling JC. Guillame (EN- EL) Cabinet Design & Construction B. Ivens (TE-CRG) AMB Technical contact M. Pezzetti (TE-CRG) Cryo Operation L. Herblin (TE- CRG) Electronics experts J. Casas (TE-CRG) / F.Formenti (TE)

9 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 9 Main personnel resources Electrical work TE-CRG-CE: 1 staff (B. Ivens) + 4 FSU EN-EL CABLING: CEGELEC + 1 staff / 1 FSU Magnetic bearing elect.: being defined, estimated 1 engineer + 1 technician. Approx. 10 persons involved for the main tasks (during 3-4 months).

10 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 10 R2E P4 budget status (budget code 99547) TE/CRG cabling manufacturing 75 kCHF (old figures 50 kCHF) new! New AMB MECOS electronics (R&D + prod.) 150 kCHF (30 kCHF 2013 / 120 kCHF 2014) EN/EL cabling 250 kCHF, 2014 budget (to be validated by EN/EL) new! new SIPART 250 (Ph1 cabling (20 kCHF 2014)- Ph2 installation (230 kCHF 2015 or later) new! AMB Commissioning 20 kCHF/ 2014 budget new! RF + Others 100 kCHF (HW + FSU manpower) new! TOTAL ~800 kCHF To be compared R2E/P8 budget was 700 KCHF (without RF relocation). S. Claudet courtesy

11 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 11 QURC R2E project overview: P8 low priority, LS2. stand by, Ph1 : ICL (already done!) and EN/EL DIC identification w.r.t technical solution as equal to P4. Cold compressor Special cables (already bought!) 75 kCHF. R2E condition don’t change until LS2. P6 low-low priority, LS2. Stand by, preparation activities for Ph1 will start this years with ICL, P6 equipment inventory and DIC identification. R2E condition measurement in 2015/2016. P6 no R2E mitigation need. US85 level 0

12 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 12 Conclusion No show stopper identified. Integration P4-P8 approved, P4 equipment inventory done, ECR release (February), planning agreed with LS1 coordination, new magnetic bearing electronic prototype validated, special cables ready (10 March MECOS validation at CERN). P4 DIC (Demande Installation Cables) approved/scheduled by EN/EL. Next steps Cabling & installation (from March 2014 to end of June, no margin). Special cable fragile  Close supervision during cabling campaign. Tight timeline & intense co-activities between cabling, cryo technical and maintenance. -> need a close technical supervision/coordination follow-up.

13

14 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 14 AMB key points EMC Cabling Connectors External & Redundant 48 VDC Power Supply AMB Advance technology (~10 years) Special cables Technology @ CERN Diagnostic knowledge improved

15 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 15 P4 Relocation UL positions

16 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 16 R2E – QURC UX452 16 Relocation QURC-EMC1/4 (VFD & AMB electronics) SIPART positionners -> splitting positionner

17 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 17 R2E – QURC UX451 17 QURCA/B-EM01 CPU deja dans UL44 QUPC armoire (CB 2011-12) Cartes E/S schneider a extraire (blocks phoenix reste dans EM01) et creer une nouvelle armoire QURCA/B-EM02 PLC securite CCS a extraire et mettre dans la meme nouvelle armoire

18 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 18 R2E – QUICA UX450 18 QUICA-EM01 CPU deja dans UL44 QUPC armoire (CB 2011-12) Cartes E/S schneider a extraire (blocks phoenix reste dans EM01) et creer une nouvelle armoire QUICA-EM02 Link/couplers a extraire et mettre dans la meme nouvelle armoire SIPART positionneurs des vannes -> positionneurs deportee (tirroirs)

19 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 19 R2E – QYC03/4 UX45½ 19 Deplacer les tirroirs, les platines et les alims labo (chauffages) deplace de 2 racks actuelle vers 4 racks pour avoir plus de place disponible Les equipements sont mellange on va les spliter dans 2 distinct ensembles, gauche et droite.

20 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 20 First STEP: Fault Detector Design and Implementation Fault Models

21 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 21 P4 SEU Mitigation for valve positionner Controller Cross Section estimation

22 LSC - 28 February 2014 - M. Pezzetti – Cryogenics 22 Cryo. equipment to be relocated Current location/name Future location/name Remark(s)DIC/#cable s/installati on order Cryo RF cavitiesUX45 level 0 QYC03-04 UL44/46 QYC01-02 Full relocationNOK/52 priority: 4 QURC cold compressors UX45 level 2 QURCA-EMC01- 04 QURCB-EMC01- 04 UL44/46 QURCA-EMC01- 04 QURCB-EMC01- 04 Full relocationQURCA: OK/93 Priority: 2 QURCB: OK/93 Priority: 3 cold box 1.8 KUX45 level 1 QURCA-EM01 QURCB-EM01 UL44/46 QURCA-EM02 QURCB-EM02 Part of eqpt to be relocated (DP/PA link coupler, power controllers for electrical heaters) valves positioners SIPART UL44 QURC-QUI EM03 Included in QURC/QUI DIC QUI (cryo. Distrib. Box 4.5 K) UX45 level 0 QUICA-EM01 valves positioners UL44 QUICA EM02 QURC-QUI EM03 Part of eqpt to be relocated (profibus link, coupler and I/O schneider card) OK/76 Priority: 1 3


Download ppt "LSC - 28 February 2014 - M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: 1346282 v.1."