Fluor K132 (Santos) Contract – Dawson’s Bend Road AustStab Awards of Excellence 2013 FK Gardner & Sons Pty Ltd Innovation or Excellence in Sustainability in Pavement Stabilisation Sponsored by
2
The Project Part of Santos’ $18.5 billion GLNG CSG venture Consists of new roads and upgrades to existing roads at the Fairview gas fields Dawson’s Bend is a 17km long critical road at the heart of the gas field required to provide access for the installation of infrastructure
3
The Problem Local quarry, Burnt Gully, was no longer able to provide the required CBR 35 material Another quarry 70km away was determined as a potential new source of material The material would require crushing and transport to the site at significant cost to the client
4
The Solution FKG undertook laboratory testing on Burnt Gully material of CBR 10 mixed with cement Results showed that a 1% cement modification could provide in excess of CBR 45 This would result in a shortened programme and reduced cost
5
The Outcome The solution saved the client in excess of $1 million over the life of the project It meant fewer trucks on the road and a reduced carbon footprint FKG conducted FWD testing and determined a 20+ year design life FKG delivered value for money and a more sustainable result