Module 2: General Working Conditions 2.2 Working Surfaces Susan Harwood Grant Number SH-17820-08-60-F-23
2
This material was produced under grant number SH-17820-08-60-F-23 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily reflect the views or polices of the U.S. Department of Labor, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government. 2
3
Describe a working surface Show how debris aloft are potentially hazardous Recognize the effects of corrosion Identify manholes and openings 3
4
4
5
5 Figure 1 Ship with barges in the slip
6
6 Figure 2 Close up view of the working surfaces and guards
7
7 Figure 3 Warning guards in place on exposed decks
8
8 Figure 4 Multiple decks and severe corrosion
9
9 Figure 5 Gangway to vessel secured
10
10 Figure 6 Engine room deck plates in place
11
11 Figure 7 Cargo boom and rigging
12
12 Figure 8 Officers quarters
13
13 Figure 9 Life boat in the hoist position
14
14 Figure 10 Corrosion along deck and external surfaces
15
15 Figure 11 Gun turret above main deck
16
16 Figure 12 Painted decks and gear awaiting to be removed
17
17 Figure 13 Rust along welds and main deck
18
18 Figure 14 Uneven surfaces
19
19 Figure 15 Personnel working along edge of vessel
20
20 Figure 16 Hull cut out at the stern of vessel
21
21 Figure 17 Personnel in life jackets working over the side
22
22 Figure 18 Reduced visibility in the engine room
23
23 Figure 19 Crews quarters and lockers
24
24 Figure 20 Personnel utilizing fall protection on scaffolding
25
25 Figure 21 Mast and ladders
26
26 Figure 22 Cutting on cargo compartment with limited access
27
27
28
28 Figure 23 Hatch covering removed before section removed
29
29 Figure 24 Open scuttle on the main hatch door
30
30 Figure 25 Combing along open hatch
31
31 Figure 26 Leading edging with warning markers
32
32 Figure 27 Workers in fall protection
33
33 Figure 28 Worker cutting above engineered guards
34
34 Figure 29 Section ready to be hoisted
35
35 Figure 30 Workers along the engineered barrier
36
36 Figure 31 Worker in all protection snapped in place
37
37 Figure 32 Engine room with deck plates in place
38
38 Figure 33 Ladder with warning tape
39
39 Figure 34 Decks removed from the deep cargo tanks
40
40
41
41
42
OSHA eTool www.osha.govwww.osha.gov The Free Dictionary www.thefreedictionary.comwww.thefreedictionary.com 42
43
43 Worker Safety is a Priority
Similar presentations