1 Second Safety Council Meeting Tucson 10-11 April 2014 Name of Meeting Location Date - Change in Slide Master Dome Hazard Analysis Discussion Jacques Sebag T&S Systems Engineer April 10, 2014 Second Safety Council Meeting April 10 and 11, 2014 | LSST Project Office N550
2
2 Second Safety Council Meeting Tucson 10-11 April 2014 Introduction − Hazard Analysis Process (covered by Chuck Gessner) − Focus on Dome Hazard Worksheet − JIRA Action Example − Hazard Mitigations − Incorporation in the Dome Baseline Design − High Level Hazards linked with Project Risk Registry
3
3 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Hazard Distribution
4
4 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Dome Hazard Distribution (Before Mitigation) Dome hazards distributed into 4 categories Dome hazard distribution: Category vs Risk Level
5
5 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Dome High Level Hazards (Before Mitigation) *
6
6 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Dome Serious Level Hazards (Before Mitigation) Shutter closure not possible Glass Safety Power ON during maintenance Dome/Crane Motion and Platform Lift
7
7 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 JIRA Action for Mitigation Analysis
8
8 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Three Mitigation Types: Interlock, Design, Procedure JIRA Action LIT-104: Create the full list of Safety Procedure Mitigations
9
9 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Design Mitigation Incorporation Ladder System Dome Maintenance Platform Access walkways Exterior Top Platform
10
10 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Ladder Systems with Intermediate Platforms and Safety Cable Safety Cable Intermediate Platforms
11
11 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Interface between Fixed and Rotating Ladders and Ducts 3” between ladders Duct Interface to be designed by Dome vendor Height: 11’
12
12 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Portable Davit Crane for Personnel Rescue
13
13 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Safety Tie Off Points for Light/Wind Screen Maintenance Access walkways Light/Wind Screen (upper) Tie Off Points Ladder for Roof Access
14
14 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Dome Exterior Top Platform Upper Aperture Shutter Doors
15
15 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Dome Exterior Top Platform Access Hatch Sliding Hatch
16
16 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Man-Lift available for Dome Maintenance
17
17 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 Light/Wind Screen Maintenance with Man-Lift
18
18 Second Safety Council Meeting Tucson 10-11 April 2014Second Safety Council Meeting Tucson April 10-11 2014 High level Hazards Linked with Project Risk Registry