Ola 230 / 115 kV Project 2010 ITS-1
2
North Americus Series Reactors 2010 ITS-2a
3
2010 ITS-2b North Americus Series Reactors
4
2010 ITS-3 McDonough 4 & 5 Network Improvement Construct the Jack McDonough – Smyrna 230 kV line via Cumberland (convert from 115 kV) and Galleria (new) substations. Add a 5 element, 230 kV ring bus at Smyrna and replace the 300 MVA 230 / 115 kV transformer with two 400 MVA transformers. The loss of the Jack McDonough – Peachtree 230 kV T.L. will cause overloading of the facilities surrounding McDonough.
5
2010 ITS-4 Pegamore 230 kV Project
6
2010 ITS-5 Thomson 500 / 230 kV Project Construct 35 miles.
7
2010 ITS-6 Union Point – Warrenton 115 kV T.L.
8
2010 ITS-7 Klondike 230 Reactor Project Fig. 1 One-line diagram of the Klondike 500 / 230 kV Substation. Install a 0.5% series reactor on the low side of the 500 / 230 kV transformer.
9
2011 ITS-8 Factory Shoals Groover Lake Factory Shoals Fact Shls Jct Douglasville East Point Gordon Rd. Gord Rd. Jct Hightower. Jct to Mableton, Jack Mac-West Mar.115 to Jack Mac.- West Mar. 115 Greenbriar Plt. Jack McDonough Buzzard Roost Boat Rock Bakers Ferry Thornton Road 230kV 115kV 230kV Post Road Problem: Loss of the Groover Lake segment of the Douglasville – Greenbriar 115kV line overloads the East Point – Gordon Rd. Jct. as early as 2011. Solution: Breaker up Buzzard Roost 230kV Add 230kV line Thornton Rd. to Factory Shoals. Add 230/115 autobank and 115 breakers at Factory Shoals. Adamsville
10
2011 ITS-9 Arkwright – Gordon #1 115 kV T.L.
11
2013 ITS-10 East Social 230 kV Series Reactor
12
2014 ITS-11 East Carrollton 230 / 115 kV Substation
13
2014 ITS-12 Goshen – Waynesboro 115 kV T.L.
14
2014 ITS-13 Hatch – Offerman 230 kV T.L.
15
2014 ITS-14 Bethabara 230 / 115 kV Project
16
2015 ITS-15 East Walton 500 / 230 kV Project
17
2016 ITS-16 Thomson Primary – Vogtle 500 kV T.L.
18
2017 ITS-17 South Metro Phase III Project
19
2017 ITS-18 Dorchester 230 kV Project
20
2017 ITS-19 Middle Fork 500 / 230 kV Project Middle Fork – Thomson 500 kV T.L. 2017 ITS-20 ITS-19 Install a 500 / 230 kV transformer at Middle Fork and loop in the South Hall – Oconee 500 kV T.L. Replace the existing 300 MVA 230 / 115 kV transformer with a 400 MVA transformer. ITS-20 Build a new 500 kV Middle Fork – Thomson 500 kV T.L. (approximately 110 miles long)
21
2017 ITS-21 Hopewell – McGrau Ford 2 nd 230 kV
22
2017 ITS-22 O’Hara 500 /230 kV Transformer #2
23
2017 ITS-23 South Hall – Suwanee 230 kV T.L.
24
2018 ITS-24 East Walton – South Hall 500 kV T.L.
25
2018 ITS-25 Sharon Springs – Suwanee 230 kV T.L.
26
2018 ITS-26 South Coweta – Yates 115 kV T.L.
27
2019 ITS-27 Blankets Creek – Holly Springs 115 kV
28
2019 ITS-28 Commerce Primary – Middle Fork 115 kV