Download presentation
Presentation is loading. Please wait.
Published byBrycen Carpenter Modified over 9 years ago
1
CARMA Fiber Plan Ed Fields Dick Plambeck 09 Sep 2004
2
basic specifications 12 connectorized fibers from control building to each antenna (8 used, 4 spare) for C,D,E arrays, each cable is ‘home run’ from antenna to control building fibers: Corning SMF-28 or equivalent –single mode –zero dispersion point at 1310 nm connectors: FC/APC (angle polished) cables: gel-filled, loose tube design
3
underground fiber: Corning Altos LST
4
antenna fiber this.... not this
5
trenching plan
6
MaxCell innerduct – 9 cables in one 4-inch conduit
7
antenna pad vault
8
fiber shoebox
9
large vault near control building
10
large vault locations
11
fiber management racks - schematic
12
fiber management racks – ADC proposal
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.