Consulting + Engineering + Technology + Construction Page 1 5/1/2015 Sharp Grossmont Hospital Pre-Bid Phasing of Early Utilities Sharp Grossmont Hospital.

Similar presentations


Presentation on theme: "Consulting + Engineering + Technology + Construction Page 1 5/1/2015 Sharp Grossmont Hospital Pre-Bid Phasing of Early Utilities Sharp Grossmont Hospital."— Presentation transcript:

1 Consulting + Engineering + Technology + Construction Page 1 5/1/2015 Sharp Grossmont Hospital Pre-Bid Phasing of Early Utilities Sharp Grossmont Hospital Pre-Bid Phasing of Early Utilities April 28th, 2011

2 5/1/2015 Page 2 Existing Site Plan Existing Loading Docks Existing Hospital Existing Central Plant

3 5/1/2015 Page 3 Final Site Plan New Diagnostic & Treatment Existing Hospital New Central Plant New Bulk O 2 & Cylinder Gas Yard

4 5/1/2015 Page 4 Temporary Loading Docks & Early Utilities Existing Hospital Temporary South Loading Dock Temporary North Loading Dock

5 5/1/2015 Page 5 Existing 950 Ton Chiller Existing 300 Ton Chiller Relocated Power Imaging Trailer Relocation Early Utilities Phase I Alternate Sidewalk New CHWS&R from 300 Ton Chiller Existing TES Tanks Existing Shed and Cargo

6 5/1/2015 Page 6 Early Utilities Phase II D&T Vault Data/Tele-com New Gas Services Natural Gas Normal Power 12Kv, E-Power, & Telecom Parking Lot Taken Out of Service New Gas Services Emergency Power Install Med Gas Vault O 2 & Cylinder Gases Sewer Women’s Center Domestic and Fire Service Cap existing Water Line

7 5/1/2015 Page 7 Early Utilities Phase III Hillside Final Grade

8 5/1/2015 Page 8 Early Utilities Phase III Emergency Power Normal Power Data/Tele-com CEP Vault Women’s Center Vault

9 5/1/2015 Page 9 Early Utilities Phase III Natural Gas Activate utilities to Women’s Center & new Natural Gas to existing Central Plant Medical Gases Future D&T and Existing Fire Service Water Main Steam & Chilled Water Utility POC’s Utility POC Water and Gas POC’s Utility POC’s Gas POC Install Utility Trench

10 5/1/2015 Page 10 Early Utilities Phase III Demolish existing utilities taken out of service Final Ring Road Grading

11 Consulting + Engineering + Technology + Construction Page 11 5/1/2015 Thank You Questions?

12 Consulting + Engineering + Technology + Construction Page 12 5/1/2015 Sharp Grossmont Hospital Phasing of Early Utilities September 30 th, 2009


Download ppt "Consulting + Engineering + Technology + Construction Page 1 5/1/2015 Sharp Grossmont Hospital Pre-Bid Phasing of Early Utilities Sharp Grossmont Hospital."