Dry Mill Ethanol Plants Environmental Impacts and Future Growth Presented to Governor’s Coalition February 10, 2006 by Bill Roddy.

Similar presentations


Presentation on theme: "Dry Mill Ethanol Plants Environmental Impacts and Future Growth Presented to Governor’s Coalition February 10, 2006 by Bill Roddy."— Presentation transcript:

1 Dry Mill Ethanol Plants Environmental Impacts and Future Growth Presented to Governor’s Coalition February 10, 2006 by Bill Roddy

2

3 110 MGY

4 Dry Mill Industry Evolution Plants in operation during each decade: ● 1980’s -175 Plants (20K to 7M gallons) ● 1990’s - 33 Plants (1.5M to 30M gallons) ● 2000’s - 91 Plants (30M to 110M gallons) ● ICM has 37 Plants in operation today ranging from 5 M to 110 M gallons

5

6 ICM Process Guarantees Ethanol-2.80 denatured (@ 5%) gallons per bushel Natural Gas-34,000 BTU per denatured gallon of ethanol with DDGS (22,000 wet cake only) Electrical - 0.75 Kw per denatured gallon per hour Emissions compliance – Written guarantee

7 "Potential to Emit" Preliminary Estimate: 100% DDGS Capability Bushmills Ethanol: 49 MMgpy (permitted), 500,000 tons/yr grain (17,857,144 bu/yr), 162,218 tpy DDGS

8 Agri-Farms, LLCNecedah, WI50 MMGPY Hawkeye Renewables ExpansionIowa Falls, IAfrom 40 to 80 MMGPY Hawkeye Renewables – FairbankFairbank, IA100 MMGPY Lincolnway EnergyNevada, IA50 MMGPY US BioenergyAlbert City, IA100 MMGPY Western Wisconsin EthanolBoyceville, WI40 MMGPY Heron Lake EthanolHeron Lake, MN50 MMGPY Superior Corn ProductsLake Odessa, MI40 MMGPY Red Trail EthanolRichardton, ND50 MMGPY Front Range EnergyWindsor, CO40 MMGPY SuncorSarnia, ONT50 MMGPY Commercial AlcoholVarennes, QUE30 MMGPY Trenton Agri Energy ExpansionTrenton, NEfrom 30 to 40 MMGPY Commonwealth Agri Energy ExpansionHopkinsville, KYfrom 20 to 33 MMGPY Prairie Horizon Agri-EnergyPhillipsburg, KS30 MMGPY The Andersons Albion EthanolAlbion, MI55 MMGPY Illinois River Energy LLCRochelle, IL50 MMGPY Heartland Grain Fuels LP ExpansionHuron, SDfrom 14 to 30 MMGPY Iroquois BioEnergy Co. LLCRensselear, IN40 MMGPY GLE RedfieldRedfield, SD40 MMGPY Aventine Renewable Energy IncPekin, IL60 MMGPY Ethanol Grain ProcessorsWashington, KS30 MMGPY Anderson’s Grain – ClymersClymers, IN110 MMGPY Demeter BloomingburgBloomingburg, OH100 MMGPY Platte Valley Ethanol ExpansionCentral City, NEfrom 40 to 80 MMGPY Big River Resources ExpansionWest Burlington, IAfrom 40 to 80 MMGPY Blue Flint EthanolUnderwood, ND50 MMGPY Siouxland EthanolJackson, NE 50 MMGPY ICM Plants Under Construction

9 Environmental Approvals ● Air Permit ● Non Contact Water Discharge (irrigation, POTW, or surface water) ● Storm water NOI & SWP2 ● Above Ground Storage Tanks ● Water Allocation Permit (supply) ● Endangered Species ● Historical and Archaeological ● Environmental Assessment (e.g., MN) Note: ICM Plants are CESQGs

10 Energy Balance ●All Studies (with exception of Professor David Pimental of Cornell) cite a net energy gain of 34% for dry mill fuel ethanol manufacture. ●Ethanol: 84,000 Btu/gal & octane 130 (compares to gasoline at 125,000 Btu/gal) ●Driving forces include; improved farming efficiencies (e.g., no till), better chemicals for weed and insect control for fewer trips in field, improved manufacturing efficiencies.

11 Required Equipment: ●Dryer Emissions: Thermal Oxidizer ●Product Loadout: Flare ●Fermentation: Improved Scrubbers ●Fugitive VOCs: Leak Detection and Repair ●Road Dust: Street Sweeping ●Process Dust: Baghouses ●Cost: $1.5 - $2.0 Million per plant (equipment) $30,000 - $50,000 per plant (fines) Impact of EPA’s Consent Decrees

12 Thermal Oxidizer Steam Generator Combustion Section Steam Drum Exhaust Stack Combustion Air & Natural Gas Water In Steam Out To Process Approximately 1500 F (Final temp determined in compliance test) Rotary Drum Dryer Exhaust Thermal Oxidizer/Heat Recovery Steam Generator

13 ICM Thermal Oxidization System

14 ICM Fermentation Scrubber

15 Key Emission Standards ● NOx, CO, VOCs (scaled), PM/PM10, SO2 are guaranteed by ICM to be less than 100 tpy each for the following: Gas Fired Steam Generation (by TO or Boilers): 100 Mgpy Coal Fired (ICM’s Clean Coal Technology; Bubbling Fluid Bed with limestone/lime & ammonia injection & baghouse): 50 Mgpy ● HAPs are guaranteed to be less than 10/25 tpy for Gas and Coal Configurations

16 Example Water Discharge* ● Source: Cooling Tower, Multi Media Filter, RO & Softener (all non contact water) ● Volume: 100 gpm ● Total Dissolved Solids: 3,000 mg/l (controlled by cooling tower cycles) ● Chlorides: 40 mg/l ● Conductivity: 5000 μmhos/centimeter ● pH: 6.5 – 9.0 ● Temperature: < 90° F *State Dependent, Water Source Dependent

17 Nuisance Odor ICM recommends development of an “Odor Action Plan” as follows: (not a regulatory requirement ) ● A single odor complaint will be immediately investigated and “validated.” ● The source of odor will be corrected or shut down and repaired. ● The plant shut will shut down if necessary to correct the source of nuisance odor. ● In case of TO failure, the plant automatically shuts down.

18 Brantford, Ontario, March 10, 2003 - The tour bus was stopped directly downwind of the ethanol plant in Monroe, Wisconsin and many got out to sniff the air. “I was very impressed with the fact that there was hardly any odor at all from the plant”, said Edith Davis, wife of Roger Davis of Davis Petroleum. “One of the reasons I came along on this tour was to make sure that the proposed ethanol plant would be a good neighbor to our community, and I am now more convinced than ever that it will be.” Nuisance Odor?

19 Environmental Impacts ● Plants are engineered to have insignificant impact on the surrounding environment. ● Water Discharge quality is engineered to meet state standards (irrigation, surface water or POTW). ● When using groundwater, test wells are installed and groundwater is monitored prior to construction to insure the water table can handle 500 gpm (typical 50 Mgy plant) without impacting the water table or nearby wells.

20 ● Erosion and sedimentation during construction are minimized with a stormwater pollution prevention plan. ● Surface runoff is controlled by stormwater pond and released after inspection. ● Process waste water is returned to the process after treating in an anaerobic digester called the biomentanator. ● The biomethanator gas (methane) displaces natural gas in the DDGS Dryer. ● Tanks are sited in an impervious secondary containment area. Environmental Impacts (cont.)

21 ● Stationary source air emissions qualify the source as a “synthetic” minor source. ● Noise levels will not exceed 80 dB off property. ● Potential for nuisance odor is minimized with the Best Available Control Technology and Odor Action Plan. ● ICM’s plants typically assure that no adverse impact on nearby natural resources will occur. ● Wetlands are typically avoided. Environmental Impacts (cont.)

22 Bad Batch (Due to Infection) ● Continue to process wet cake or DDG ● Blend it back in ● Truck to municipal waste plant DO NOT: Goals: ● Avoiding Land application Land filling

23 ICM’s Future ● ICM’s backlog: Nearly 100 US plants in planning stages 6 foreign plants in planning stages 1 Canadian plant under construction (50 MGY) ● Predicted sizes: 50 to 110 MGY range 200 MGY under discussion ● Demand for coal energy increasing ICM’s first coal plant is operational (50 MGY) Coal guarantee currently limited to PRB coal (0.25% sulfur)