River Operations Initiatives for Water Quality Management
Presentation to Lower Opihi Catchment Group 23rd October 2014 Tony McCormick – CEO Opuha Water Ltd
2
Presentation Overview
Opuha – scheme operation Water quality issues River Lake Flushing Flows Other Initiatives Conclusion
3
Max Irrigation Flow 6.6 cumecs
Scheme Overview Lake Opuha Opuha River Hectares Kakahu Totara Valley Levels Plain Sutherlands Above Dam Other Total Max Irrigation Flow cumecs Opihi River Kakahu Scheme Fairlie Tengawai River Saleyards Bridge (min flow measured) Totara Valley Scheme Opihi River Sutherlands Scheme Pleasant Point Levels Plain Scheme Timaru
4
Opuha Dam and lake. Power Station is below dam (lower centre of picture)
5
Next slide is the view from here, looking downstream
6
View downstream from dam showing regulating pond and downstream weir (top right of picture)
7
Fusible Embankment 700+ cumecs
Radial Gate 32 cumecs Fixed Spillway 80 cumecs Fusible Embankment 700+ cumecs View at downstream weir where water release to river is controlled
8
View of downstream weir: L to R – Gate (32 cumecs); Spillway (80 cumecs); Fusible Embankment (flood flow ~700+ cumecs) Fusible Embankment Radial Gate Spillway
9
Opuha Dam & Power Station Operation
Dam 50m high Lake 710ha, 72 million m3, 22m range Power Station 50m head, 7MW, 16 cumecs Annual Generation 26 GWh Downstream Weir cumecs 392m --- Lake Opuha Dam Power Station Downstream Weir 370m --- Regulating Pond Opuha River Regulating Pond level fluctuates with power station operation. River flow is maintained at steady rate through gate at downstream weir
10
Opuha Dam & Power Station Operation
Dam 50m high Lake 710ha, 72 million m3, 22m range Power Station 50m head, 7MW, 16 cumecs Annual Generation 26 GWh Downstream Weir cumecs 392m --- Lake Opuha Dam Power Station Downstream Weir 370m --- Regulating Pond Opuha River Regulating Pond level fluctuates with power station operation. River flow is maintained at steady rate through gate at downstream weir
11
Water Quality Issues River Lake Periphyton growth Didymo – nuisance
Phormidium – toxic Water chemistry Lake Inflows – nitrate and phosphorous ???? Top of lake recreation (avian or bovine) ???? Limnological natural water chemistry when low oxygen conditions exist manganese and iron
12
Flushing Flows – Key Locations
Dam site Lake Opuha Opuha River Skiptons (13km) (flow measured) Opihi River Kakahu Scheme Fairlie Tengawai River Confluence (26 km) Saleyards Bridge (min flow measured) Saleyards Bridge (42km) (flow measured) Totara Valley Scheme Opihi River Sutherlands Scheme SH1 Bridge (52km) (flow measured) Pleasant Point Levels Plain Scheme Timaru
13
2014 v 2013
14
Flow Attenuation
15
River Mouth – Opening & Timing
16
Periphyton Removal
17
Periphyton Removal Didymo removal 76%, 85% and 89%
Improved on %, 12% and 40%
18
River Temperature
19
Other Initiatives River Lake Operations Adaptive flow regime
Investigations Enhanced monitoring (long term programme) Exposure/Drying Sand feeding Dissolved iron Lake Aeration enhancement
20
Conclusion No silver bullet Multi faceted issue
On going investigations improve understanding and enable … Effective adaptive operations and management