Download presentation
Presentation is loading. Please wait.
Published byMarley Pender Modified over 9 years ago
1
Data Collection Device (DCD) Job Aid – Burn-in In DOIS Log onto DOIS. Click Options on the DOIS menu bar. Click on Utilities. Click DCD Software Burn-In. Click either Capture Mail Volumes or Street Data Collection (Form 3999) In the DCD Perform Command Boot. Plug in power supply and connect to serial cable Press and hold and keys simultaneously. Press and release the key. Release all keys. (Screen should display Command Mode, Select Function, Self Test) Press the key twice. (Screen should display Select Function, Program Loader) Press the key. (Screen should display Warning: EEPROM will be erased. Continue?) Press the key. (Screen should display Comm Parameters, Baud, 4 9600) Press the key twice. (Screen should display Comm Parameters, Baud, 6 38400) Press the key. (Screen should display Data Bits, 7) Press the key. (Screen should display Parity, Odd) Press the key. (Screen should display Flow Control, None) Press the key once. (Screen should display Flow Control, Xon/ Xoff) Press the key. (Screen should display Comm Parameters, Start?) Press the key. In DOIS Click the DCD Ready button. In the DCD (Screen should display Program Loader, Receiving:) This process should take 60 – 90 seconds. (Screen should display Program Loader, Status 0000) In DOIS Click OK to DOIS message: DCD Burn-in process initiated. (Inspect DCD for successful load – STATUS 0000) In the DCD Turn the DCD off, and perform a cold boot to start the program. See Job Aid – Troubleshooting panel 4. In DOIS Log onto DOIS. Click Options on the DOIS menu bar. Click on Utilities. Click DCD Software Burn-In. Click either Capture Mail Volumes or Street Data Collection (Form 3999) In the DCD Perform Command Boot. Plug in power supply and connect to serial cable Press and hold and keys simultaneously. Press and release the key. Release all keys. (Screen should display Command Mode, Select Function, Self Test) Press the key twice. (Screen should display Select Function, Program Loader) Press the key. (Screen should display Warning: EEPROM will be erased. Continue?) Press the key. (Screen should display Comm Parameters, Baud, 4 9600) Press the key twice. (Screen should display Comm Parameters, Baud, 6 38400) Press the key. (Screen should display Data Bits, 7) Press the key. (Screen should display Parity, Odd) Press the key. (Screen should display Flow Control, None) Press the key once. (Screen should display Flow Control, Xon/ Xoff) Press the key. (Screen should display Comm Parameters, Start?) Press the key. In DOIS Click the DCD Ready button. In the DCD (Screen should display Program Loader, Receiving:) This process should take 60 – 90 seconds. (Screen should display Program Loader, Status 0000) In DOIS Click OK to DOIS message: DCD Burn-in process initiated. (Inspect DCD for successful load – STATUS 0000) In the DCD Turn the DCD off, and perform a cold boot to start the program. See Job Aid – Troubleshooting panel 4. To load the routes file from DOIS: In DOIS Click Options on the menu bar Click on Utilities Click on DCD Configuration – Mail Volumes In the DCD Perform a cold boot (See Job Aid – Troubleshooting, panel 4 for details) Verify the date and time and press From the menu screen select for transfer In DOIS Click on the “Load Route Data” button to begin transfer When file is transferred, click “OK” to acknowledge successful transfer. In the DCD Screen will be back at the date and time screen, ready for use in recording volumes. To load the routes file from DOIS: In DOIS Click Options on the menu bar Click on Utilities Click on DCD Configuration – Mail Volumes In the DCD Perform a cold boot (See Job Aid – Troubleshooting, panel 4 for details) Verify the date and time and press From the menu screen select for transfer In DOIS Click on the “Load Route Data” button to begin transfer When file is transferred, click “OK” to acknowledge successful transfer. In the DCD Screen will be back at the date and time screen, ready for use in recording volumes. To load a 3999 from DOIS into the DCD: In DOIS on the Office side: Go to the Route & Unit Maint. tab on the Route side: From the selected adjustment, go to the Adjustment Workbench Instructions from here out are for both sides: Click on DCD Transfer Select Data Transfer from DOIS to DCD Select desired zip code if necessary Highlight desired route from left column and click right arrow to move to right. In the DCD From the Main Route Inspection Menu, select for download In DOIS Within 90 seconds, hit the “DCD ready” button (DCD screen will show that it is receiving data) Click “OK” to acknowledge successful transfer In the DCD Screen says “File Transfer Complete. Press a key...” Screen will be back at the main menu ready to begin the street inspection NOTE: A 3999 completed within the realm of a special or formal inspection MUST be uploaded on the route side of DOIS To load a 3999 from DOIS into the DCD: In DOIS on the Office side: Go to the Route & Unit Maint. tab on the Route side: From the selected adjustment, go to the Adjustment Workbench Instructions from here out are for both sides: Click on DCD Transfer Select Data Transfer from DOIS to DCD Select desired zip code if necessary Highlight desired route from left column and click right arrow to move to right. In the DCD From the Main Route Inspection Menu, select for download In DOIS Within 90 seconds, hit the “DCD ready” button (DCD screen will show that it is receiving data) Click “OK” to acknowledge successful transfer In the DCD Screen says “File Transfer Complete. Press a key...” Screen will be back at the main menu ready to begin the street inspection NOTE: A 3999 completed within the realm of a special or formal inspection MUST be uploaded on the route side of DOIS 1 2 3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.