LARISSA 27-28 September 2007
2
PROVINCIAL CIVIL PROTECTION PLAN Hydraulic risk Landslide risk Seismic risk Adopted by DCP 127 18/07/05 Adopted by DCP 89 18/09/06 Adopted by DCP 79 17/09/07
3
CIVIL PROTECTION PLAN SEISMIC HAZARD funded by MEDACTHU www.provincia.terni.it/protezionecivile
4
PLAN STRUCTURE DAMAGE SCENARIOS EVALUATION DATABASE OF AVAILABLE RESOURCES INTERVENTION MODEL Organizational structure Procedures Seismic hazard Seismic classification Anthropic arrangment items and their vulnerability Expected seismic event scenario Territorial Informations CARTOGRAFIA OPERATIVA Operating cartography
5
DAMAGE SCENARIOS EVALUATION Census of high risk buildings and of infrastructural strategic works. Study of the vulnerability of the public structures, in particular of schools, in function of the characteristic parameters of every building: period of construction, constructive and typologic characteristics. Development of one methodology of analysis of statistical type
6
PLAN STRUCTURE Organizational structure Command and Control System Operating centres 14 Support Functions Monitoring system Comunication system Procedures Intervention phases INTERVENTION MODEL 33 Municipal Operating Centre 4 Intermunicipal Operating Centre For each function there is one or more functional foreman National Monitoring system- INGV National Monitoring system - INGV PREFECTURE OF TERNI
7
Specific meetings have been organized with all municipality with the aim to analyze the city structure of every municipal territory, therefore to characterize the exact positioning of meeting point in case of an earthquake for people and the ways of exodus. Several meetings have been organized with all the subjects interested (about 100) for the definition of common procedures to adopt in an earthquake emergency, reaching to a shared model. A protocol of understanding among the Province of Terni, Prefecture, local and regional authorities and volunteers has been signed for the definition of the modalities of a management after an earthquake sharing standardized procedures.
8
I<V I>VII EARTHQUA KE V<I<VII TIME=0 ALLARMPHASE EMERGENCY PHASE SCENARIO TYPE 1 SCENARIO TYPE2 SCENARIO TYPE 2 SCENARIO TYPE1 SCENARIO TYPE 1
9
ALLARMPHASE EMERGENCY PHASE SCENARIO TYPE2 SCENARIO TYPE 2 Seism >VII Mercalli Scale - Magnitude > 5 LIKE Umbria-Marche Earthquake 26.09.97 (10 years ago) First main shock = VIII Mercalli (5,6 R) time: 02:33 Second main shock = IX Mercalli (5,8 R) time: 11:40 Over 2.000 aftershock in 15 days Over 20.000 homeless SCENARIO TYPE 1 Seism V - VII (Mercalli scale)- Magnitude 3,5 - 5. This phase begins after an earthquakeThis phase begins after an earthquake Each authority puts the procedures into practiceEach authority puts the procedures into practice Each authority communicates to Prefecture about the damages further to eartyhquakeEach authority communicates to Prefecture about the damages further to eartyhquake Prefecture establishes the real seismic effectPrefecture establishes the real seismic effect
10
Like Vulcain scenario, a second mainshock (IX Mercalli -5,8 R), during rescue activities, caused a lot of damages and death of 4 persons during an inspection to assess damages on the Abbey ASSISI ABBEY 26.09.07 - 11:40
11
FOLIGNO
12
The emergency plan contains each action for each authority Prefecture, local and regional authorities and volunteers know what they have to do thanks to a set of forms
13
ALLARMPHASE EMERGENCY PHASE SCENARIO TYPE 1 EMERGENCY PHASE SCENARIO TYPE 2
14
WHO SIGNED THE PROTOCOL OF UNDERSTANDING Province of Terni Prefecture of Terni Region of Umbria Firebrigades Municipalities Local Authorities Italian Red Cross Volunteers Police Traffic Police Provincial Headquarters of Carabinieri Local health authorities Road operator Railway operator