Presentation is loading. Please wait.

Presentation is loading. Please wait.

How to Get Better Lighting with Less Money European Commission DG JRC Trezzano Rosa INTEL 2003 Milan, 21 May 2003.

Similar presentations


Presentation on theme: "How to Get Better Lighting with Less Money European Commission DG JRC Trezzano Rosa INTEL 2003 Milan, 21 May 2003."— Presentation transcript:

1 How to Get Better Lighting with Less Money European Commission DG JRC Trezzano Rosa INTEL 2003 Milan, 21 May 2003

2 Luciano BurroMunicipality of Trezzano Rosa2 Trezzano Rosa 3.904 resident population (31.03.03) Milano

3 Luciano BurroMunicipality of Trezzano Rosa3 Energy Savings with TPF Third Party Financing Energy Savings on Public Lighting

4 Luciano BurroMunicipality of Trezzano Rosa4 Procedures Public contract Call for bids

5 Luciano BurroMunicipality of Trezzano Rosa5 Scheme TPF Tiesco AUDIT FEASIBILITY STUDY CONTRACT DRAFTING PLANNING INSTALLATION MONITORING MAINTENANCE SAVINGS Municipality

6 Luciano BurroMunicipality of Trezzano Rosa6 SAVINGS

7 Luciano BurroMunicipality of Trezzano Rosa7 FINANCIAL FLOWS Municipality Suppliers Tiesco Medium term loans Performance service Pay-back on savings Payments Repayments Technology Loans

8 Luciano BurroMunicipality of Trezzano Rosa8 Advantages to Municipality No investments Guaranteed and shared savings Guaranteed technologies Joint management of energy and future implementations

9 Luciano BurroMunicipality of Trezzano Rosa9 Baseline Lighting

10 Luciano BurroMunicipality of Trezzano Rosa10 Before

11 Luciano BurroMunicipality of Trezzano Rosa11 Post-installation Lighting

12 Luciano BurroMunicipality of Trezzano Rosa12 After - 1

13 Luciano BurroMunicipality of Trezzano Rosa13 After - 2

14 Luciano BurroMunicipality of Trezzano Rosa14 Lighting increase + 197.200 lumen

15 Luciano BurroMunicipality of Trezzano Rosa15 Economic Results Economic Savings: –112.944 kWh/yr of electric energy –17 KW/yr of contractual power –Elimination of penalties for low power factor (cos  <0.9) –From “Management on call” to “Programmed Management” 16.657 €/year 16.657 €/year 248.855 € in 15 years 248.855 € in 15 years

16 Luciano BurroMunicipality of Trezzano Rosa16 Environmental Results Environmental Savings: –Reduction of sky pollution (LR 17/00 Regione Lombardia) –Reduction of atmospheric pollution 82,3 t CO 2 /yr, … NOx, … SOx, … (Kyoto Protocol, …)

17 Luciano BurroMunicipality of Trezzano Rosa17 IPMVP International Performance Measurement & Verification Protocol to define Energy Savings Polo Tecnologico per l’Energia Trento

18 Luciano BurroMunicipality of Trezzano Rosa18 Fernando Savorana Comunedi Trezzano Rosa I.P.O.

19 Luciano BurroMunicipality of Trezzano Rosa19 Environmental Fund ENERGY SAVINGS Tiesco Municipality Private Business

20 Luciano BurroMunicipality of Trezzano Rosa20 Trezzano Rosa GreenLight Award 2003

21 Luciano BurroMunicipality of Trezzano Rosa21 Contacts Comune di Trezzano Rosa Assessorato all’Ambiente Luciano Burro Tel+39 02 92 01 99 1 Fax+39 02 92 01 99 59 Emailluc.bur@libero.it


Download ppt "How to Get Better Lighting with Less Money European Commission DG JRC Trezzano Rosa INTEL 2003 Milan, 21 May 2003."

Similar presentations


Ads by Google